Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 24, 2020 SAM #6751
SOLICITATION NOTICE

59 -- 59--CABLE ASSEMBLY,SPEC

Notice Date
5/22/2020 8:08:57 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010420QNC09
 
Response Due
5/7/2020 12:00:00 AM
 
Archive Date
05/22/2020
 
Point of Contact
Telephone: 7176052227
 
E-Mail Address
DANIELLE.RHONE@NAVY.MIL
(DANIELLE.RHONE@NAVY.MIL)
 
Awardee
null
 
Description
CONTACT INFORMATION|4|N744.26|7LV|717-605-2227|danielle.rhone@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001/MIL-I-45208 (see specifications - sections C & E for more details)| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report|N/A|TBD|N00104|TBD|TBD|See Schedule|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A|danielle.rhone@navy.mil matthew.ogilvie@navy.mil| | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|one|0001|30|360|BOTH: NAVSUP WSS 5450 Carlisle Pike Mechanicsburg PA 17050 ATTN: Danielle Rhone, Contracting Officer, Code N744.26 via email: danielle.rhone@navy.mi AND Commanding Officer ATTN: Matthew Og ilvie, Code 242MO NSWC Philadelphia Division 5001 S Broad Street Philadelphia, PA 19112-1403 DODAAC: N64489|TBD|TBD|30|X|| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEC 2017))|5|||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JAN 2019)(DEVIATION 2019-O0003)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS CERTIFICATE (NOV 2014)|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019)|12|335931|500||||||||||| REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCESERVICES OR EQUIPMENT (AUG 2019))|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|5|||X|WILL|| EVALUATION CRITERIA AND BASIS FOR AWARD-|1| X| 1. This solicitation is being issued under Special Emergency Procurement Authority. 2. All contractual documents (i.e. contracts, purchase orders, task orders, andmodifications) related to the instant procurement are considered to be ""issued""by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. 3. Drawings can be viewed or downloaded at www.neco.navy.mil via the beta.sam or contract opportunities link (FBO is now closed). 4. NAVSUP WSS Mech will be considering past performance in the evaluation of offers iaw FAR 13.106. See clauses DFARs 252.213-7000 and NAVSUP WSS term WSSTERMMZ04. 5. Please note this requirement has First Article Test requirements. 6. THE FOLLOWING DELIVERY SCHEDULE APPLIES: CDRL ITEM Timeline Delivery A001-Submit Quality Control Inspection/Test Plan - 30 days ADC Approval of Quality Control Inspection/Test Plan - 60 days ADC A002 - Submit First Article Test/Inspection Procedure - 90 days ADC Approval of First Article Test/Inspection Procedure - 120 days ADC A004 - Submit Certificate of Compliance - Material (Molds) - 150 days ADC Approval of Certificate of Compliance - Material (Molds) - 180 days ADC A005 - Submit Visual Dimensional Inspection Report (Molds) - 210 days ADC Approval of Visual Dimensional Inspection Report (Molds) - 240 days ADC A003 - Submit First Article Test/Inspection Report - 360 Days ADC Approval of First Article Test/Inspection Report - 390 Days ADC A006 - Submit Bulk Cable Inspection Test Report - 420 Days ADC Approval of Bulk Cable Inspection/Test Report - 450 Days ADC A007 - Submit Certificate of Conformance - 420 days ADC Approval of Bulk Certificate of Conformance - 450 days ADC A008 - Submit Certificate of Compliance for various items - 420 days ADC Approval of Certificate of Compliance - 450 days ADC A009 - Submit Bulk Cable Inspection/Test Report - 420 days ADC Approval of Bulk Cable Inspection Test Report - 450 days ADC A00A - Submit Cable Assembly Inspection/Test Report 480 days ADC Approval of Cable Assembly Inspection/Test Report 510 days ADC A00B - Submit Mercury Exclusion Certificate - 480 days ADC Approval of Mercury Exclusion Cert - 510 days ADC Final Shipment of production units - 540 days ADC NOTE: Earlier submission and approval of each item is hereby desired and authorized. 7. NOTICE TO SURPLUS/NEW SURPLUS/NEW MANUFACTURED SURPLUS SUPPLIERS: Submission of your quote without a surplus certificate will null and void your quote, thus making it unresponsive. A surplus material certificate must accompany all quotes for surplus/new surplus/new manufacture. If submitting quote via NECO, a faxed or scanned copy must be sent to the buyer. 8. If you are not the manufacturer of the material you are offering, you MUST state who the OEM is (name and cage code) and the part number you are offering andprovide traceability information requested. 9. Please note that when submitting quotes via NECO, make sure you specify anyexceptions (I.E. MIL SPECS/STANDARDS, PACKAGING, I&A, PACKAGING HOUSES ETC) orfollow up with a hardcopy of the exceptions. If nothing is indicated orreceived, award will be based upon solicitation requirements. Changes orrequest for changes after award may have consideration costs deducted onsubsequent modifications. 10. Contractor Retention of Supply Chain Traceability Documentation (SEP 2016) (1) By submitting a quotation or offer, the contractor agrees that, when the contractor is not the manufacturer of the item, it is confirming that it currently has or will obtain retain documented evidence (supply chain traceability documentation) that the item is from the approved manufacturer and conforms to the technical requirements. The retention period is five years after final payment underthis contract. (2) At a minimum, the supply chain traceability documentation for the item shallinclude: basic item description, part number and/or national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, where available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. (3) Examples of acceptable supply chain traceability documentation can be found at: http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/ (4) The contractor shall immediately make available documentation upon request of the contracting officer. The contracting officer determines the acceptability and sufficiency of documentation. If the contractor fails to retain or provide the documentation or the contracting officer finds the document to be unacceptable, corrective action may be taken including, but not limited to undelivered orders or rejection of delivered supplies. Offers for Part Numbered Items (SEP 2016) (a) For part numbered items, identified in the item description only by the name of an approved source (CAGE code), a part number, and a brief description. Exact product - applies to contract line-item(s) (CLIN(s)):__________ CAGE Code__________ part number____________________ Alternate product - applies to CLIN(s):___________ CAGE code __________ part number ________ Superseding part number - applies to CLIN(s): _____ CAGE code __________ part number ________ Identify reason for superseding part number: Administrative P/N change only: Yes____ No____ Minor change/No change in configuration: Yes____ No____ Previously-approved product - applies to CLIN(s): _____ Contract or Solicitation Number: ____________________ CAGE code __________ part number ________ Correction to CAGE/Part Number - applies to CLIN(s) _____ CAGE code in error/same corporation, different division Yes ___ No___ CAGE code in error/sold to different corporation Yes ___ No___ Part number not recognized Yes ___ No__ _Obsolete part number Yes ___ No___ Other Yes ___ No___ (b) Exact product means a product described by the name of an approved source and its corresponding part number cited in the item description; and manufactured by, or under the direction of, that approved source. An offeror of an exact product must meet one of the descriptions below. (1) An approved source offering its part number cited in the item description; (2) A dealer/distributor offering the product of an approved source and part number description; (3) A manufacturer who produces the offered item under the direction of an approved source; and has authorization from that approved source to manufacture theitem, identify it as that approved source's name and part number, and sell the item directly to the Government. (4) A dealer/distributor offering the product of a manufacturer that meets the description in subparagraph (3) above. (c) Alternate product. (1) The offeror must indicate that an alternate product is being offered if theofferor is any one of the following: (i) An offeror who manufactures the item for an approved source cited in the item description, but does not have authorization from the approved source to identify it as the approved source part number, and dell the item directly to the Government; (ii) A dealer/distributor offering the product of a manufacturer that meets thedescription in (i) above; (iii) An offeror whose product does not meet the criteria of exact product, superseding product, or previously approved product. (2) An offer of an alternate product is an alternate offer. (d) The offeror must indicate that a superseding part number is being offered if the offered item otherwise qualifies as an exact product, except that the part number cited in the item description has been superseded due to an administrative part number change with no change in configuration of the item. (e) The offeror must indicate that a previously approved product is being offered if the product offered has previously been delivered to the Government or otherwise previously evaluated and approved. (f) Correction to CAGE/Part Number Cited in the Item Description. Submitted by offeror to notify the Government if there is a CAGE code error: same corporation/different division; sold to different corporation; part number not recognized; obsolete part number; other. (g) Traceability documentation. (1) The contracting officer may request evidence of the technical acceptability of the product offered. The evidence must be submitted within 2 days, or asotherwise specified, or the offer will not be considered. (2) For offers of exact product, offerors other than the approved manufacturing source must retain evidence and provide the traceability evidence of the identity of the item and its manufacturing source when requested by the contracting officer. (i) If offered item(s) are not in stock or not yet manufactured, a copy of an original quotation from the approved source to the offeror identifying exact item cited in item description and quantity sufficient to satisfy the solicitation requirement. (ii) If offered item(s) are shipped or in stock, a copy of invoice on approved source's letterhead; or a copy of packing slip which accompanied shipment from approved source to offeror. The invoices and packing slips must identify exact item cited in item description and a quantity sufficient to satisfy the solicitation requirement. (iii) If the offeror is an authorized dealer/distributor, or manufactures the item for an approved source, a copy of the contractual agreement with, or the express written authority of, the approved source to buy, stock, repackage, sell, or distribute the part. The agreement must specifically identify the exact item, or otherwise ensure that the offeror is authorized by the approved source to manufacture or distribute the exact item being acquired. If the agreement covers a general product line or is otherwise not product specific, the offeror must furnish additional documentation to address the exact item being acquired. (iv) Other verifiable information. (1) For superseding part number, the offeror may be requested to furnish evidence to establish that there are no changes in the configuration of the part. (2) For previously approved products, upon request of the contracting officer, the offeror must furnish the contract, solicitation, source approval request (SAR) package, or letter of approval under which the product was previously furnished or approved. (h) Alternate offer data. (1) The contracting officer may request drawings, specifications, or other data necessary to clearly describe the characteristics and features of an alternate offer. Data submitted shall cover design, materials, performance, function, interchangeability, inspection or testing criteria, and other characteristics ofthe offered product. The contracting officer may also request drawings and otherdata covering the design, materials, etc., of the exact product cited in the item description if the Agency does not possess data sufficient to evaluate the alternate product. The data must be submitted within 10 days, or as otherwise specified, or the offer will not be considered. (2) If the alternate product is a reverse-engineered product, the offeror shall provide: technical documentation to establish that the offered item represents the exact item specified in the item description (i.e. invoice from an approved source or submission of samples having markings of an approved source); number of samples that were examined; the process/logic used; raw data (measurements, lab reports, test results) used to prepare drawings or specifications for the offered item; any additional evidence that indicates the reverse-engineered item will function properly in the end item; and any evidence that life cycle/reliability considerations have been analyzed. \ 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;AN/BRR-6 Outboard Cable Assembly (2W3); for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 ; NCSL Z540.3 - 8/3/06 may be used in lieu of ISO 10012 - 4/15/03; 2.1.2 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.1.3 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=8590844 |53711| D| |D|0001 | D|49998|0101265 DRAWING DATA=8590854 |53711| -| |D|0001 | -|49998|0080043 DRAWING DATA=8603515 |53711| A| |D|0001 | A|49998|0333492 DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01| DOCUMENT REF DATA=MIL-DTL-915 | | |G |020822|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |000930|A| |04| DOCUMENT REF DATA=ISO9001 | | | |150915|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-M-24041 | | |C |810817|A| | | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=A-A-56032 | | |D |030321|A| | | DOCUMENT REF DATA=MS28774M | | | |090423|A| | | DOCUMENT REF DATA=SAE-AMS2817-11/2016 | | |G | |A| | | DOCUMENT REF DATA=SAE-AS23053-10/2016 | | | | |A| | | DOCUMENT REF DATA=SAE-AS28775A - 11/2013 | | | | |A| | | DOCUMENT REF DATA=NAVSEA S9320-AM-PRO-020/MLDG | | |02 |990801|A| | | DOCUMENT REF DATA=S9320-AM-PRO-030/MLDG 02/2005 | | |03 | |A| | | DOCUMENT CHANGE DATA=AMS-DTL-23053/5B |SAE-AS23053-2016 DOCUMENT CHANGE DATA=AMS-2817 |SAE-AMS2817G DOCUMENT CHANGE DATA=MS28775E |SAE-AS28775A 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;AN/BRR-6 Outboard Cable Assembly (2W3); furnished under this contract/purchase order shall meet the material, electrical, mechanical, physical and test requirements as specified on Drawings 8590844 (consisting of Item Numbers 1, 2, 3, 5 thru 9), 8590854 and 8603515, NAVSEA Manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG and including associated specifications mentioned in this procurement. ; 3.1.1 ;The AN/BRR-6 2W3 Mold Assembly shall be manufactured per the guidance of Drawing 8603515 (consisting of Item Numbers 1 thru 14) as required by Drawing 8590844.; 3.1.2 ;The connectors metal plug bodies (Item No. 5 of drawing 8590844) surface preparation, application and inspection of non-conductive coating (Plasma Coating) shall be in accordance with NAVSEA Manual S9320-AM-PRO-030/MLDG as specified on Drawing 8590854.; 3.1.3 ;The Polyurethane Molding Compound Type II, Color Amber shall be in accordance with MIL-M-24041 requirements as specified on Drawing 8590844.; 3.1.4 ;All outboard molded cable assemblies shall be manufactured and tested in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG requirements as specified on Drawings 8590844, Note 4 and 8590854, Note 4.; 3.2 ;Vendor Qualification. As required by Drawing 8590854:; 3.2.1 ;Only vendors which are qualified, per the audit requirements of NAVSEA Manual S9320-AM-PRO-020/MLDG Appendix II-A, and listed on the approved vendors lists inappendixII-A of NAVSEA Manual S9320-AM-PRO-020/MLDG, shall be authorized to fabricate submarine outboard cable assemblies.; 3.2.2 ;Metal plug bodies surface preparation is only by vendors which are qualified, per the auditrequirements of NAVSEA Manual S9320-AM-PRO-030/MLDG Appendix III-H, and listedon the approved vendors lists in appendix III-I of NAVSEA Manual S9320-AM-PRO-030/MLDG Appendix III-H, and listed on the approved vendorslists in appendix III-I of NAVSEA ManualS9320-AM-PRO-030/MLDG, shall be authorized to fabricate non-conductive plasma sprayed ceramiccoatedsubmarine outboard connector metal plug bodies.; 3.3 ;Marking Requirements - The supplier shall permanently mark and identify each first article and production lot unit ;Cable Assembly; in accordance with Note 7 of Drawing 8590844 per MIL-STD-130. ;Per Note 6 of Drawing 8590844, the supplier shall contact Jason Krol, jason.krol@navy.mil of NSWC Philadelphia Division for component serial number information.;; 3.3.1 ;The supplier shall mark ;tag or bag; all piece parts with contract, drawing/ part, heat, lot or batch and serial number in accordance with MIL-STD-130 until installed in the designated assembly.; 3.4 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing /inspection procedure and approval are required for ;Cable Assembly;. Government approval is required prior to commencement of first article unit.; 3.5 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWC PD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.ogilvie@navy.mil, Code 242MO after award of contract.; 3.5.1 ;The NSWC PD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWC PD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.6 Configuration Control - MIL-STD-973 entitled ""Configuration Management"", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a ""Warning Plate"" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110; 4.5 ;Finished Edges - Finished shall be in accordance with the applicable drawing requirements.; 4.6 ;Material Control - The supplier shall have an effective material control system that provides for the control of materials by heat, lot or batch as ordered for first article and production lot units. ; 4.7 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;Cable Assembly; in accordance with the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG, and their approved first article procedure.; 4.7.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWC PD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWC PD representative has the option of being present during the first article testing/inspection.; 4.8 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/ Inspection Procedure for ;Cable Assembly; in accordance with the requirements of DI-NDTI-80603, the applicable drawings and specifications, NAVSEA S9320-AM-PRO-030 /MLDG and S9320-AM-PRO-020/MLDG, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROC per DI-NDTI-80603A; 4.9 ;First Article Testing/Inspection ;Cable Assembly; - The supplier shall perform 100% examination, inspection and testing on the completed first article unit (bulk cable/ component parts/assembly) in accordance with the applicable drawings, NAVSEA S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG, and their approved first article procedure. The supplier shall record the actual measurements and readings results of each examination, inspection and test in NAVSEA S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG, and each dimension identified on the applicable drawings.; 4.9.1 ;The supplier shall visually inspect and perform electrical continuity and dc insulation resistance testing 100% on the ;Bulk Cable; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.9.2 ;The supplier shall visually and physically inspect 100% the connectors (Item No.5 of drawing 8590844) in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.9.3 ;The supplier shall verify and inspect 100% the connectors metal plug bodies (Item No. 5 of drawing 8590844) surface has been prepared and plasma coated in accordance with NAVSEA S9320-AM-PRO-030/MLDG requirements.; 4.9.4 ;The supplier shall visually and physically inspect 100% the completed ;Cable Assembly; of each dimension identified on Drawing 8590844 including the identification and markings required by Notes 7 and 8 of the drawing.; 4.9.5 ;The supplier shall visually inspect 100% the molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.9.6 ;The supplier shall perform 100% electrical continuity test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.9.7 ;The supplier shall perform 100% insulation resistance test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.9.8 ;The supplier shall perform 100% nondestructive bonding test on molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/ MLDG requirements.; 4.9.9 ;The supplier shall perform 100% hydrostatic pressure test on the completed ;Cable Assembly; including insulation resistance testing in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for completed first article unit ;Cable Assembly; testing/ inspection reports in compliance with the requirements of DI-NDTI-80603, the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The report shall also include a copy of ;Certificate of Conformance for: Materials, Plasma Coating, Polyurethane Molding Compound, Back Fill and Primer; Certificate of Compliance for RG58 Coaxial Bulk Cable, Connectors, Polychloroprene Material; and Bulk Cable Inspection/Test Report; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORTS per DI-NDTI-80809B; 4.11 ;Production Lot. The supplier shall perform 100% examination, inspection and testing on each completed production lot unit (bulk cable/component parts/assembly) in accordance with the applicable drawings, NAVSEA S9320-AM-PRO-020/MLDG and S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The supplier shall record the actual measurements and readings results of each examination, inspection and test in NAVSEA S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG and each dimension identified on the applicable drawings.; 4.11.1 ;The supplier shall visually inspect and perform electrical continuity and...
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/f3b3dc77d41e49c8b3277186c86943cb/view)
 
Record
SN05669289-F 20200524/200522230159 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.