Y -- COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATION S-705; MIAMI-DADE COUNTY, FLORIDA

Notice Date
8/14/2020 3:18:28 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT JACKSONVI JACKSONVILLE FL 32207-8175 USA
 
ZIP Code
32207-8175
 
Solicitation Number
W912EP20R0031
 
Response Due
9/14/2020 11:00:00 AM
 
Archive Date
12/31/2020
 
Point of Contact
Timothy G. Humphrey, Phone: 9042321072, Tedra Thompson, Phone: 9042321051
 
E-Mail Address
Timothy.G.Humphrey@usace.army.mil, Tedra.N.Thompson@usace.army.mil
(Timothy.G.Humphrey@usace.army.mil, Tedra.N.Thompson@usace.army.mil)
 
Description
The BBCW Contract 5A covers the construction of Pump Station S-705.� The S-705 pump station has a capacity of 100 cfs and is located on the L-31E Canal at the intersection with the C-102. S-705 will pump water into an L-31E Canal segment, south of C-102 and north of Military Canal.� The water in this segment will flow, through culverts, into wetlands east of the L-31E Levee.� S-705 will also feature a 72-inch culvert with a slide gate to pass flows for internal drainage. The pump station will have manatee protective barriers, trash racks, and dewatering features, complete with stop logs.� The slide gate at S-705 will be operated by an electric-motor actuator.� Controls will be located in a stand-alone, precast concrete building adjacent to the pump station structure.� The pumps and gate will have remote operation capability. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, an HDPE culvert, a slide gate, precast, concrete, control buildings, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing, excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone, installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams. In-water construction utilizing divers will be necessary, because of dewatering difficulty due to the local geology and high conductivity of the underlying limestone. Soil borings indicate the presence of hard limestone within the project area.� Excavation of limestone may require large excavator with rock bucket.� Materials for embankment and backfill construction can be obtained from offsite sources provided by the Contractor and approved by the Contracting Officer or the Contractor can process the excavated material to meet the classification of satisfactory material for embankment fill and or select fill at no additional cost to the Government.�Contract does not allow blasting within the construction limits.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/05c5ab35da444721a8df5db22c93d0a1/view)
 
Place of Performance
Address: FL, USA
Country: USA
 
Record
SN05758015-F 20200816/200814230149 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)