SOURCES SOUGHT

Z -- CHL023 Moose Creek Dam Safety Modification

Notice Date
8/14/2020 11:50:03 AM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SN ENDIST ALASKA ANCHORAGE AK 99506-0898 USA
 
ZIP Code
99506-0898
 
Solicitation Number
W911KB21R0001
 
Response Due
8/17/2020 11:00:00 AM
 
Archive Date
12/30/2020
 
Point of Contact
John L McComas, Contracting Specialist, Phone: 907-753-2593, Christine A. Dale, Contracting Officer, Phone: 907 753-5618, Fax: 907 753-2544
 
E-Mail Address
john.l.mccomas@usace.army.mil, christine.a.dale@usace.army.mil
(john.l.mccomas@usace.army.mil, christine.a.dale@usace.army.mil)
 
Description
This update is to publish the virtual industry day slides being present on 17 August 2020 and to provide a change to the industry day meeting area. Please see attached documents. Physical Site Visit:��Hard Hat, Steel Toe Boots/Shoes, Reflective Vest, Hearing Protection, Safety Glasses are required. Active construction is going on near dam control works. MOOSE CREEK DAM SAFETY MODIFICATION INDUSTRY DAY / SITE VISIT NOTICE -- AUGUST 2020 INTRODUCTION Chena River Lakes Flood Control Project The Moose Creek Dam Safety Modification project is for construction of a mix-in-place barrier wall in the embankment of Moose Creek Dam at the Chena River Lakes Flood Control Project. This will consist of constructing 4.5 miles of barrier wall 56 to 66.5 feet below the crest of the dam embankment with Portland Cement and Bentonite. The barrier wall is expected to be between 24 and 30 inches wide and have an unconfined compressive strength of 200 psi at 28 days and approach 500 psi in the long term. Sheet pile will be driven around the low point drain and control works to have a continuous wall through penetrations in the embankment. The intent of the barrier wall is to sever a continuous fine grained sand / silty sand that is highly erodible under the embankment material. Mix in place methods shall be utilized to mix the embankment and foundation materials with Bentonite and Portland Cement in order to construct a Barrier Wall through Moose Creek Dam. Any methods that utilize a bentonite slurry trench to support the embankment while excavation of the barrier wall takes place will NOT be utilized at Moose Creek Dam. The potential loss of slurry could result in failure of the embankment into the excavation during construction due to highly pervious foundation materials. The NAICS Code for this requirement is 237990, Other Heavy and Civil Engineering Construction. The disclosure of magnitude for this project is between $100,000,000.00 and $250,000,000.00. The U.S. Army Corps of Engineers, Alaska District, will be holding an Industry Day Events and Site Visit for the Moose Creek Dam Safety Modification per the following: Events����������������������������������������������������������������� Date���������������� Time 1) Virtual Site Visit and Presentation ����� 17 Aug 2020 ���� 10:00 AM (AST) 2) Physical Site Visit��������������������������������������� 20 Aug 2020����� 11:00 AM (AST) 3) Virtual 1-on-1 with Industry����������������� �27 Aug 2020����� As scheduled with Contract Specialist Event 1: Virtual Site Visit and Presentation will be held virtually via WebEx: https://usace.webex.com/usace/j.php?MTID=m636b4e3faebe864288f5ffe2a26ee382 Meeting Password:������������������������������� TeNivxyA632 Audio Conference�� USA Toll-Free:�������� (877)848-7030 USA Caller Paid/International Toll:��������� (404)443-2170 ACCESS CODE:���������� ����������������������������������� 8673123 The purpose of the Virtual Industry Day is to provide the most recent project data to those interested contractors. This is the information presentation for event 2. Event 2: Physical Site Visit will be held at the Chena River Lakes Flood Control Project: 3800 Laurance Rd, North Pole, AK 99705�(See attached ""Industry Day Meeting Area.pdf). The purpose of this physical site visit is to allow contractors the ability to view the dam/project location prior to winter conditions in Alaska. The tentative schedule anticipates that the Solicitation for this project will occur sometime in the First Quarter of 2021 (Calendar Year) and based on historical weather, the site will be under significant amount of snow during the solicitation period. NOTE 1: There will not be a slide show presentation at Event 2 and questions will not be entertained at the site visit. Contractors shall submit questions in writing. All questions and answers will be posted to beta.sam.gov once the Government has consolidated them. NOTE 2: If attending the site visit at the project location, please provide the contract specialist via email, john.l.mccomas@usace.army.mil the names, email addresses and phone numbers for those attending in person. NOTE 3: Access to the USACE project office will not be allowed due to health concerns. Please meet at the meeting point shown on ""Industry Day Meeting Area.pdf). NOTE4: The most recent health guidance for travel to Alaska can be found at: http://dhss.alaska.gov/dph/Epi/id/Pages/COVID-19/travel.aspx Event 3: Virtual 1-on-1 with Industry will be held via WebEx with those interested prime contractors/offerors in order to receive capability briefings and receive feedback based on the virtual Industry Day presentation. Those contractors wishing to have a virtual 1-on-1 meeting should contact the contract specialist to schedule a briefing time slot no later than 4:00PM (AST) on 20 August 2020. INTERESTED PARTIES: Registration will be required by Webex in order to attend the Virtual Industry Day. Virtual 1-on-1 capability briefing times can be reserved for interested prime contractors by contacting the contract specialist. Questions regarding the special notice posting must be directed to the solicitation point of contact listed in beta.sam.gov. Proprietary information and trade secrets, if any, must be clearly marked on all materials. All information received that is marked Proprietary will be handled accordingly. Please be advised that all submissions become Government property and will not be returned. All Government and contractor personnel reviewing responses will have signed non-disclosure agreements and understand their responsibility for proper use and protection from unauthorized disclosure of proprietary information as described in 41 USC � 423. The Government shall not be held liable for any damages incurred if proprietary information is not properly identified. DISCLAIMER: THIS INDUSTRY DAY NOTICE IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/c46e65adcacc495ba02ef68db52c6a09/view)
 
Place of Performance
Address: The majority of work will be performed at Chena River Lakes Flood Control Project, North Pole, AK, USA
Country: USA
 
Record
SN05759790-F 20200816/200814230201 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.