Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 15, 2021 SAM #6987
SOLICITATION NOTICE

Z -- Fort Randall Major Unit Rehabilitation Project

Notice Date
1/13/2021 2:43:32 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F21R0005
 
Response Due
3/25/2021 12:00:00 PM
 
Archive Date
04/09/2021
 
Point of Contact
Jessica R. Jackson, Contract Specialist, Nadine Catania, Contracting Officer
 
E-Mail Address
jessica.r.jackson@usace.army.mil, nadine.l.catania@usace.army.mil
(jessica.r.jackson@usace.army.mil, nadine.l.catania@usace.army.mil)
 
Description
**01/13/21: SITE VISIT SIGN-IN SHEETS POSTED** **12/21/20: REFERENCE DRAWINGS POSTED (2 FILES)** **SUMMARY OF CHANGES POSTED** The Government hereby issues the�solicitation for the Fort Randall Major Unit Rehab.� The solicitation closes on 25 March 2021 at 2pm Central.��The solicitation is Unrestricted and Open to Both Large and Small Business Participation.� � ***UPDATED SITE VISIT INFORMATION*** Site visit dates will be 12 and 13 Jan 2021 beginning at 09:00 AM. Contractors must provide a list of attendees and preferred date no later than 22 Dec 2020.� Due to COVID 19 restrictions, potential bidders will be limited to a single day on site and the number of attendees may be restricted if necessary.� Non-US citizen attendees must be identified to the Government NO LATER THAN 17 Dec 2020 to ensure prior approval is obtained.� To facilitate the necessary travel arrangements, the approved site visit date will be provided by the Government to each contractor no later than 28 Dec 2020.� During the site visit one unit will be dewatered and penstock open for turbine inspection.� The turbine maintenance platform will be installed.� The generator housing will be open with three upper hatches removed and will be available for inspection and measurements.� The shrouds are far enough from the machine to allow an adult to easily sit upright with complete access to the full end windings, finger plates, and circuit rings around the entirety of the machine. Stator frame wrapper inspection covers will be removed. A radiator will be removed in the vicinity of a frame split.� Spare parts (e.g., coils and stator laminations) are in a warehouse and may be brought to the powerhouse for inspection. Contractors interested in attending the site visit must make reservation with and forward non-US Citizen requests to Robin Puskar by e-mail at Robin.L.Puskar@usace.army.mil. Contractors are to meet at the Powerhouse on the assigned date.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a78e275a15884bc09bfb180d3c58b56b/view)
 
Place of Performance
Address: Pickstown, SD, USA
Country: USA
 
Record
SN05891267-F 20210115/210113230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.