Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 21, 2022 SAM #7477
SOLICITATION NOTICE

Z -- DRY CREEK ECOSYSTEM RESTORATION PROJECT - PHASE I

Notice Date
5/19/2022 4:16:28 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W075 ENDIST SAN FRAN SAN FRANCISCO CA 94102-3406 USA
 
ZIP Code
94102-3406
 
Solicitation Number
W912P722B0002
 
Response Due
5/19/2022 2:00:00 PM
 
Archive Date
06/03/2022
 
Point of Contact
Joshua Kaimikaua, Phone: 4155036988, Mary Fronck, Phone: 4155036554
 
E-Mail Address
Joshua.J.Kaimikaua@usace.army.mil, mary.fronck@usace.army.mil
(Joshua.J.Kaimikaua@usace.army.mil, mary.fronck@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Bid Opening Abstract posted on 19 May 2022. See attached OF 1419 for details. Amendment 0005 issued on 12 May 2022. Please see Amendment 0005 documents attached.� Amendment 0004 issued on 6 May 2022.�Also, please see the attachment titled ""W912P722B0002 Request for Information Responses Part III"". Amendment 0003 issued on 3 May 2022.�Please see Amendment 0003 document attached. Request for Information Responses Part II posted on 27 April 2022. Please see the attachments titled ""W912P722B0002 Request for Information Responses Part II""�and ""W912P722B0002 Geotechnical Report"" for further details. Site Visit conducted on 20 April 2022. Please see site visit documents attached. Amendment 0002 issued on 15 April 2022. Please see Amendment 0002 documents attached. Also, please see the Request for Information Responses attached for reference. Amendment 0001 issued on 11 April 2022. Please see Amendment 0001 documents attached. DRY CREEK ECOSYSTEM RESTORATION PROJECT - PHASE I JOB DESCRIPTION: The project is located along Dry Creek, just downstream of Warm Springs Dam near Healdsburg, Sonoma County, California. The main objective of the project is to restore stream and floodplain habitat for fish and wildlife, including threatened and endangered salmon, along approximately one mile of Dry Creek. The habitat restoration features planned for the project includes construction of stream side channels, riffles, backwaters and alcoves to slow the speed of the water to create refuge for young fish. The features will be constructed using natural materials such as logs and rocks. Bank stabilization measures will prevent or reduce erosion and provide vegetation cover. The majority of the construction will occur on privately owned vineyard property. Please refer to the project specifications, plans and environmental references attached for project information and instructions for submitting a bid. Site Visit: An organized site visit has been scheduled for 20 April 2022 at 10:00 AM Pacific Standard Time. Each contractor is limited to TWO (2) personnel for the site visit. The meeting location is: Milt Brandt Visitor Center, 3227 Stewarts Point-Skaggs Springs Road, Geyserville CA, 95441. If possible, please provide notification by 3:00 PM PST on 18 April 2022 to the contract specialist, Joshua Kaimikaua, at joshua.j.kaimikaua@usace.army.mil if you are planning to attend the site visit. This is solely for the Government�s planning purposes.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/70926ff088114605910879b195de730d/view)
 
Place of Performance
Address: Healdsburg, CA, USA
Country: USA
 
Record
SN06332296-F 20220521/220519230057 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.