Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 26, 2023 SAM #7730
SOLICITATION NOTICE

10 -- GUIDE ASSEMBLY

Notice Date
1/24/2023 9:51:13 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
SPRMM1 DLA MECHANICSBURG MECHANICSBURG PA 17055-0788 USA
 
ZIP Code
17055-0788
 
Solicitation Number
SPRMM122QPQ52
 
Response Due
4/14/2022 9:00:00 PM
 
Archive Date
09/30/2024
 
Point of Contact
Telephone: 2157377149
 
E-Mail Address
SHANTELL.LAWRENCE@DLA.MIL
(SHANTELL.LAWRENCE@DLA.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| EQUAL OPPORTUNITY (SEP 2016)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|333244|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| THIS AWARD IS BEING ISSUED UNDER SEPA AUTHORITY. As a result, this procurement IS EXEMPT from IUID IAWDFARS 211.274-2(b)(1). Any order resulting from this Request for Quotation will require electronic submittal of Receiving Reports and Invoices through PIEE-WAWF. Evaluation for the award of proposed requirement will be based upon the lowest aggregate total price submitted for the total quantity. 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;OE-592 Guide Assembly #7; for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.1.2 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The ""Document Changes"" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=4491153 |53711| Z| |D|0001 | Z|49998|0071223 DRAWING DATA=4491153 |53711| Z| |D|0002 | Z|49998|0060648 DRAWING DATA=4491153 |53711| Z| |D|0003 | V|49998|0191416 DRAWING DATA=4491153 |53711| Z| |D|0004 | Z|49998|0090314 DRAWING DATA=4491153 |53711| Z| |D|0005 | Z|49998|0092035 DRAWING DATA=4491153 |53711| Z| |D|0006 | Z|49998|0062649 DRAWING DATA=4491153 |53711| Z| |D|0007 | Z|49998|0070999 DRAWING DATA=4491153 |53711| Z| |D|0008 | Z|49998|0060529 DRAWING DATA=4491153 |53711| Z| |D|0009 | Z|49998|0081918 DRAWING DATA=4491153 |53711| Z| |D|0010 | Z|49998|0075037 DRAWING DATA=4491153 |53711| Z| |D|0011 | T|49998|0081894 DRAWING DATA=4491153 |53711| Z| |D|0012 | W|49998|0201869 DRAWING DATA=4491153 |53711| Z| |D|0013 | Z|49998|0084735 DRAWING DATA=4491153 |53711| Z| |D|0014 | T|49998|0090177 DRAWING DATA=4491153 |53711| Z| |D|0015 | Z|49998|0083541 DRAWING DATA=4491153 |53711| Z| |D|0016 | Z|49998|0081266 DRAWING DATA=4491153 |53711| Z| |D|0017 | Z|49998|0051308 DRAWING DATA=4491153 |53711| Z| |D|0018 | P|49998|0044174 DRAWING DATA=4491153 |53711| Z| |D|0019 | Z|49998|0092241 DRAWING DATA=4491153 |53711| Z| |D|0020 | R|49998|0077023 DRAWING DATA=4491153 |53711| Z| |D|0021 | W|49998|0076127 DRAWING DATA=4491153 |53711| Z| |D|0022 | V|49998|0076941 DRAWING DATA=4491153 |53711| Z| |D|0023 | Z|49998|0047909 DRAWING DATA=4491153 |53711| Z| |D|0024 | Z|49998|0100921 DRAWING DATA=4491153 |53711| Z| |D|0025 | Z|49998|0094799 DRAWING DATA=4491153 |53711| Z| |D|0026 | Z|49998|0066582 DRAWING DATA=4491153 |53711| Z| |D|0027 | Z|49998|0044329 DOCUMENT REF DATA=TEFLON (COML) | | | | |A| | | DOCUMENT REF DATA=ASME B46.1 | | | |090101|A| | | DOCUMENT REF DATA=ISO 9001 | | | |150919|A| | | DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-STD-2035A | | | |950515|A| | | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=MIL-PRF-6855F | | | |120227|A| | | DOCUMENT REF DATA=FED-STD-28/20B | | | |940310|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763D | | | |150301|A| | | DOCUMENT REF DATA=COATING VC-3 (COML) | | | | |A| | | DOCUMENT REF DATA=ASTM A240/A240M | | | |191201|A| | | DOCUMENT REF DATA=QQ-N-281D, AM#2 | | | |851023|A| | | DOCUMENT REF DATA=MIL-STD-130N CHG. 1 | | | |121116|A| | | DOCUMENT REF DATA=MIL-I-45208A AM.2 | | | |951103|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010/278 | | |A |130214|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |990216|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |000930|A| | | DOCUMENT CHANGE DATA=MIL-R-6855 |MIL-PRF-6855 DOCUMENT CHANGE DATA=MIL-STD-248 |NAVSEA S9074-AQ-GIB-010/248 DOCUMENT CHANGE DATA=MIL-STD-271 |NAVSEA T9074-AQ-GIB-010/271 DOCUMENT CHANGE DATA=MIL-STD-278 |NAVSEA S9074-AR-GIB-010/278 DOCUMENT CHANGE DATA=NAVSHIPS 0900-003-8000 |MIL-STD-2035 DOCUMENT CHANGE DATA=QQ-S-763 |SAE AMS QQ-S-763 DOCUMENT CHANGE DATA=QQ-S-766 |ASTM A240/A240M 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;OE-592 Guide Assembly #7; furnished under this contract/purchase order shall meet the material, mechanical, physical, welding and test requirements as specified on Drawing 4491153, Piece Number #7 consisting of Piece Numbers 11B(12,13,14), 15, 21, 22, 31, 32, 42(26, 43), 49 thru 52, 55, 95(17, 96), 100, 106, 110, 111, 113B thru 116, 118, 120, 121, 122, 129 thru 132, 135(37, 39, 128, 133 & 134) including associated specifications mentioned in this procurement. ; 3.1.1 ;The supplier shall perform all welding and nondestructive testing and inspection on ;Guide Assembly #7; in accordance with the requirements of NAVSEA Technical Publications S9074-AR-GIB-010/278, T9074-AS-GIB-010/271 and MIL-STD-2035 specified on Drawing 4491153, Note 9.; 3.1.2 ;The supplier welders performing welding on ;Guide Assembly #7; shall be qualified in accordance with NAVSEA Technical Publication S9074-AQ-GIB-010/248 as specified on Drawing 4491153, Note 9.; 3.2 ;Marking Requirements - The supplier shall permanently mark and identify each first article and production lot unit ;Guide Assembly #7; in accordance with Notes 5, 11 and 12 of Drawing 4491153.; 3.2.1 ;The supplier shall mark ;tag or bag; all pieces with contract, drawing/piece, heat, lot or batch and serial number in accordance with MIL-STD-130 until installed in the designated assembly.; 3.3 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing /inspection procedure and approval are required for ;Guide Assembly #7;. Government approval is required prior to commencement of first article unit.; 3.4 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.ogilvie@navy.mil, Code 242MO after award of contract.; 3.4.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.5 Configuration Control - MIL-STD-973 entitled ""Configuration Management"", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.5.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.6 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a ""Warning Plate"" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110 ; 4.5 ;Surface Roughness - All surface finishes are in RMS measurements. Where the degree of surface roughness is indicated, the surface shall be free from all visible imperfections as defined by Standard ASME B46.1.; 4.6 ;Finished Edges - Finished shall be in accordance with the applicable drawing requirements.; 4.7 ;Threads - Threads shall be inspected in accordance with FED-STD-H28/20 System 21 requirements. Thread inspection shall include the measurement and recording of the major diameter for external threads and the minor diameter for internal threads.; 4.8 ;Material Control - The supplier shall have an effective material control system that provides for certified quantitative mill or industrial laboratory reports of chemical and physical analysis by heat, lot or batch for raw material ordered for first article and production lot units. If the material is subsequently heat-treated a certification of physical analysis, after heat treatment is also required for each heat lot or batch. Also, where the applicable material specification calls out (e.g. corrosion resistance test, macro-etch test) these test results shall also be reported on the applicable mill or industrial laboratory report. The physical analysis shall establish the following properties for metallic parts: Ultimate Tensile Strength, Yield Strength and Elongation.; 4.9 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;Guide Assembly #7; in accordance with the applicable drawing and specifications, and their approved first article procedure and nondestructive testing (liquid penetrant) procedure.; 4.9.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.10 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/ Inspection Procedure for ;Guide Assembly #7; in accordance with the requirements of DI-NDTI-80603, the applicable drawing and specifications as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROC per DI-NDTI-80603A; 4.11 ;First Article Testing/Inspection ;Guide Assembly #7; - The supplier shall perform 100% examination, inspection and testing on the first article ;Guide Assembly #7; unit (component parts/assembly) in accordance with the applicable drawing, their approved first article procedure and nondestructive testing (liquid penetrant) procedure. The supplier shall record the actual measurements and readings results of each dimension, threads, examination, inspection and test identified on the applicable drawing.; 4.11.1 ;The supplier shall visually and physically inspect 100% the (component parts/assembly) dimensions and threads (including of the major diameter for external threads and the minor diameter for internal threads) identified on the applicable drawing. Threads shall be inspected 100% and results recorded.; 4.11.2 ;The supplier shall perform NDT (liquid penetrant) inspection testing 100% as shown on Drawing 4491153 in accordance with their approved nondestructive testing procedure.; 4.12 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/ Inspection). The supplier shall submit for completed first article unit ;Guide Assembly #7; testing/inspection reports in compliance with the requirements of DI-NDTI-80603, the applicable drawing and specifications. The report shall also include a copy of ;Mill Material Certification; Weld Rod Certification; Certificate of Compliance for Materials; Visual/Dimensional Inspection Report; NDT Liquid Penetrant Inspection Testing Report; Welder's Qualification Certification; NDT Liquid Penetrant Inspector Qualification Certification; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI- 80809B; 4.13 ;Production Lot. The supplier shall perform 100% examination, inspection and testing on each production lot ;Guide Assembly #7; unit (component parts/assemblies) in accordance with the applicable drawing and their approved nondestructive testing (liquid penetrant) procedure. The supplier shall record the actual measurements and results of each dimension, threads, examination, inspection and test identified on the applicable drawing.; 4.13.1 ;The supplier shall visually and physically inspect 100% on each (component parts/ assemblies) dimensions and threads (including of the major diameter for external threads and the minor diameter for internal threads) identified on the applicable drawing. Threads shall be inspected 100% and results recorded.; 4.13.2 ;The supplier shall perform NDT (liquid penetrant) inspection testing 100% as shown on Drawing 4491153 in accordance with their approved nondestructive testing procedure.; 4.14 ;PROCEDURES; 4.14.1 ;Welding Procedure - The supplier shall prepare and submit a written welding procedure and welding procedure qualification test data for performing welding in accordance with NAVSEA Technical Publications S9074-AR-GIB-010/278 and S9074-AQ-GIB-010/248 including welder's qualification per Tech S9074-AQ-GIB-010/248 as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the Welding and Welding Qualification Test Data Procedure is required prior to commencement of first article unit. CDRL: WELDING AND WELDING QUALIFICATION TEST DATA PROC per NAVSEA TECHNICAL PUBLICATION S9074-AR-GIB-010/278 AND S9074-AQ-GIB-010/248; 4.14.2 ;Nondestructive Testing (NDT) Procedure - The supplier shall prepare and submit a written nondestructive testing procedure for Liquid Penetrant inspection testing in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271 and Acceptance Standard MIL-STD-2035 including nondestructive test personnel qualifications per Tech Pub T9074-AS-GIB-010/271 as indicated on the Contract Data Requirements List (DD Form1423). Government approval of the NDT Liquid Penetrant Inspection Testing Procedure is required prior to commencement of first article unit. CDRL: NDT LIQUID PENETRANT INSPECTION TESTING PROC per NAVSEA TECH PUB T9074-AS-GIB-010/271 and MIL-STD-2035; 4.15 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units. ; 4.16 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR. NSWCPD shall either issue Specific Government Inspection Instructions or Inspection Hold Points based on whether DCMA or NSWCPD will be performing the required Inspections/Tests. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.17 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of materials used in the fabrication of ;OE-592 Guide Assembly #7;. Records shall be traceable by drawing/piece, heat, lot or batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.17.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/piece, heat, lot or batch, contract and assembly serial number. Supplier format is acceptable for the below listed CDRLs. a. Certified Quantitative Mill or Industrial Laboratory Certification (chemical and physical analysis) for Pieces 11B thru 15, 17, 21, 22, 26, 31, 32, 37, 39, 43, 49, 50, 96, 100, 106, 110, 113B thru 116, 120, 121, 122, 128, 131 thru 134 of drawing 4491153.CDRL: CERTIFIED QUANTITATIVE MILL CERTIFICATION per DI-MISC-80678 b. Certification of Weld Rod used in the manufacturing of Guide Assembly shall be in accordance with NAVSEA Technical Publication S9074-AR-GIB-010/278. CDRL: WELD ROD CERTIFICATION per DI-MISC-80678c c. Certificate of Compliance for Materials: (1) Roller (certifying Piece Numbers 51, 52 & 55 to drawing 4491153 requirements). (2) Coating, Thread (certifying Piece Number 111 to drawing 4491153 requirements). (3) Washer, Flat (certifying Piece Number 118 to drawing 4491153 and MS 51859-10 requirements). (4) Grommet & Strain Relief (certifying Piece Numbers 129 and 130 to drawing 4491153 and MIL-PRF-6855 requirements). CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-80678 d. Visual/Dimensional Inspection Reports shall show all the characteristics, the actual measurement and results of each dimension inspected (component parts/ assemblies) including threads (also the major diameter for external threads and the minor diameter for internal threads), contract number, name of supplier, drawing/ piece number, drawing revision letter, heat, lot or batch number, serial number, and assembly serial number, item nomenclature and inspector's acceptance signature and date. CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT perDI-NDTI-80809B e. NDT Liquid Penetrant Inspection Testing Report shall be in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271. CDRL: NDT LIQUID PENETRANT INSPECTION TESTING REPORT per NAVSEA TECH PUB T9074-AS-GIB-010/271 f. Welder's Qualification Certification of personnel performing welding shall be in accordance with NAVSEA Technical Publication S9074-AR-GIB-010/278. CDRL: WELDER'S QUALIFICATION CERTIFICATION per NAVSEA TECH PUB S9074-AR-GIB-010/278 g. NDT Inspector Qualification Certification of personnel performing Liquid Penetrant nondestructive inspection testing shall be in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271. CDRL: NDT LIQUID PENETRANT INSPECTOR CERTIFICATION per NAVSEA TECH PUB T9074-AS-GIB-010/271 h. Mercury Exclusion Certification (representing the contract units shipment) CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-80678; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for ""Official Use Only"" and ""NOFORN"" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a ""Distribution Statement"" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. DATE OF FIRST SUBMISSION=ASREQ ;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIADIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ ;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ ;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ ;PROCEDURE SHALL BE IN ACCORDANCE WITH NAVSEA TECHNICALPUBLICATION S9074-AR-GIB-010/278.;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ WELDING QUALIFICATION TEST DATA - PROCEDURE & WELDER'S QUALIFICATION PROCEDURE SHALL BE IN ACCORDANCE WITH NAVSEA TECHNICAL PUBLICATION S9074-AQ-GIB-010/248.;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A005.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ NONDESTRUCTIVE TESTING PROCEDURE - LIQUID PENETRANT (SEE BLOCK 16) ;PROCEDURE SHALL BE IN ACCORDANCE WITH NAVSEA TECHNICALPUBLICATION T9074-AS-GIB-010/271.;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A006.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ CERTIFIED QUANTITATIVE MILL CERTIFICATION (SEE BLOCK 16) ;SUPPLIER FORMAT IS ACCEPTABLE.; ;CERTIFIED MILL CERTIFICATION FOR DRAWING PIECE NOS. 11B THRU 15, 17, 21, 22, 26, 31, 32, 37, 39, 43, 49, 50, 96, 100, 106, 110, 113B THRU 116, 120, 121, 122, 128, 131 THRU 134.; ;APPROVAL OF THE CERTIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A007. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ WELD ROD CERTIFICATION ;SUPPLIER FORMAT IS ACCEPTABLE.; ;CERTIFI...
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/cd0176969bac461e8f4056d19648caf6/view)
 
Record
SN06571781-F 20230126/230124230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.