Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 22, 2023 SAM #8030
SOLICITATION NOTICE

Y -- Tionesta Water Tank Rehab, Tionesta, Forest County, Pennsylvania

Notice Date
11/20/2023 7:57:37 AM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
W072 ENDIST PITTSBURGH PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN24B8002
 
Response Due
12/20/2023 8:00:00 AM
 
Archive Date
02/29/2024
 
Point of Contact
CONNIE FERGUSON, Phone: 4123957551, Janie RONEY, Phone: 412-395-7474
 
E-Mail Address
connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil
(connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Tionesta Water Tank Rehab, Tionesta, Forest County, Pennsylvania, The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the rehabilitation of the elevated water tank at Tionesta Lake, Forest County, PA. The contract generally includes the removal and replacement of interior piping and related appurtenances, removal and replacement of interior 6- inch concrete slab and removable grating, removal and replacement of electric panels, and the removal and replacement of exterior piping. The major features of the requirements are identified below.The contract specifically includes:A. The removal, disposal, and ?in-kind? replacement of all interior pedestal and tank piping and valves including the risers, overflow, and drain lines along with all heat tracing, insulation, supports, and associated appurtenances.B. The removal, disposal, and replacement of the interior 6-in concrete slab to allow for the replacement of any embedded piping. This includes all fill, steel reinforcement, expansion materials, and appurtenances associated with any penetrations though the concrete slab.C. The removal, disposal, and ?in-kind? replacement of the removable grating and its associated angles.D. The removal, disposal, and replacement of the interior electrical panels including Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical panels shall functionally duplicate the existing panels.Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.Construction work will occur in close proximity to flood mitigation and recreation areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year.Seasonal recreation requires the water tank to be in operation Memorial Day (May 27, 2024) through Labor Day (September 02, 2024). All shutdowns are to be coordinated with the Contracting Officer or designated representative. **** NOTICE ****� �Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to� https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on �View FFP Contract Changes Playbook Here�.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3b4f3f927b2147de83c7757ee18f1e84/view)
 
Record
SN06890012-F 20231122/231120230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.