SOLICITATION NOTICE

61 -- 526-21-107 Replace Main EMD Generators and Cooling Towers

Notice Date
6/11/2025 11:55:56 AM
 
Notice Type
Presolicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24225B0038
 
Response Due
6/25/2025 1:00:00 PM
 
Archive Date
10/02/2025
 
Point of Contact
Patricia Cordero, Contract Specialist, Phone: (718) 584-9000 X4928
 
E-Mail Address
Patricia.Cordero@va.gov
(Patricia.Cordero@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY Project No. 526-26-102; Replace Main EMD Generators and Cooling Towers at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES GENERAL SCOPE/Statement of Work. The Contractor must furnish all labor, materials, tools and supervision to complete the following: The department of Veterans Affairs is soliciting offers/bids from qualified SDVOSB firms for Construction services to provide labor, material and supervision for the Replace Main EMD Generators and Cooling Towers project located at the James J Peters VA Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 and as specified on the plans, specifications, and contract documents. General Scope: . The purpose of this project is to The primary project objective is to replace the Main EMD Generators at the Bronx, NY VAMC. This includes renovations to the existing Motor Pool Building. As part of this effort, the tasks include evaluating locations for a new Load Bank and ensuring the project meets VA Physical Security and Resiliency Design Manual (PSRDM) mitigation measures. As part of the overall project, modifications to the site area around the Motor Pool Building and other new project features will be necessary to achieve the overall project goal. We are explicitly noting that it is the General Contractor s responsibility to complete all required work related to: Final relay settings Field testing and commissioning Coordination with the neutral grounding resistors All Protective Relays and PLCs are to be replaced with NEW equipment It is the General Contractor's responsibility to complete all required work related to all aspects of this contract. The VA has completed prior Market Research to identify acceptable sub-contractors for specific specialized work tasks. The coordination with all subcontractors is the FULL responsibility of the General Contractor. The pre-approved subcontractors and the related specific specialized work tasks are included within Drawing E-604. It is the Contractor s responsibility to ensure that the new configuration of the circuit breakers, controls, protective replaying, PT s, CT s, Test Switches, etc provide the specified emergency system operation scheme. The project entails design for replacement of existing EMD generators and their associated cooling towers. Modification of the existing Motor Pool Building to house new electrical switchgear serving the EMD Generators. Compliance with the PSRDM is required. The Motor Pool building has offices, work areas and a storage areas. The office and work areas are to remain. Existing storage room will be demolished. A new addition will be constructed to house the new electrical switchgear. Two means of egress are required, not through the Motor Pool Building. Addition must be constructed in accordance with the VA PSRDM. Two new dry coolers will replace the existing cooling towers and will be located on the roof of the new addition. The existing building is currently protected with a fire sprinkler system. The sprinkler system will be modified as necessary for this project. Piping will be extended from the existing system and designed to provide protection for the new switchgear room. The fire alarm system will be extended to provide notification and initiation devices for the new switchgear room. The existing building fire alarm site-wide panel is located on the first floor in the Graphic Control Room. All work shall be completed as specified on the plans, specifications, and contract documents. REPLACE EMD GENERATORS: CIVIL 1) Per PSRDM mitigation measures, bollards are needed near the building southwest corners and new exterior door locations. 2) Sidewalks, ramps and elevated pad are needed to accommodate new building exterior doors. 3) All exterior grades around the Motor Pool Building will be adjusted as necessary to accommodate the renovated building. 4) Curbing shall be replaced where necessary due to utility trenching. 5) The new load bank will be placed on a slope requiring a retaining wall to create a level pad area for the structure. The load bank is proposed to be best situated to conform to the existing slope and to avoid impact to the nearby existing sanitary sewer line. All grades shall be adjusted as necessary to accommodate the load bank pad and wall. A sidewalk/access will be needed to the load bank. 6) The building is proposed to expand over an existing sanitary manhole. The sanitary manhole collects sewage from Building 101, stormwater from the parking area north of the Motor Pool Building and overflow from a sand trap manhole to the south. The stormwater is currently piped under the Motor Pool Building. All existing stormwater connections to this manhole are proposed to be rerouted around the building. The manhole shall be removed, and the sanitary line extended to a new manhole outside of the new building expansion where it shall be routed back to the existing downstream sanitary sewer line. 7) The sanitary lateral from the Motor Pool Building shall also be replaced/reset to accommodate the access ramp to a new building doorway. 8) The existing out of service steam line from Building 101 to Building 16 shall be removed where needed to accommodate all new infrastructure, capped and abandoned in other areas. 9) A new security gate will be added near Building 102 (Fisher House). 10) Temporary erosion controls will be needed during construction. 11) All disturbed asphalt and concrete areas will need to be restored. All pavement markings disturbed shall be repainted. 12) All disturbed turf grass areas will need revegetated. STRUCTURAL 1) The existing walkway (Elev. 158 -5 ) needs to be demolished and replaced with a new platform to meet the maintenance requirement of the new equipment. 2) The existing generator pad will be verified with the installation requirement of the new generator. 3) New concrete equipment pad. 4) Extension on the existing equipment pad. 5) Partially demo the existing Motor Pool Building (MPB) to build the Electrical Switch Gear Building (ESGB). 6) Supporting new load bank 7) New cast-in-place concrete equipment pads will be installed for the proposed electrical and mechanical equipment as required. 8) Existing cast-in-place equipment pads will be extended as required to fit new equipment as required. 9) Two SCRs will be located at different elevations. The SCR 101-SCR-01 will be located on the radiator room floor while the SCR 101-SCR-02 will be installed in the generator room located on the SCR platform. 10) Additional WF steel will be added as required to support the new equipment on the floor and hangers for supporting the platforms in the generator room. 11) A new service platform will be installed to support two DPFs, starting from the North access door/landing (located at EL. 158 -5 ) to the edge location of the existing platform on the south side, between Column B6 and C4. The railing of the North access door/landing will be removed to accommodate this extension. 12) The door at the South-East shall be demolished and the opening of the door will be moving down to the floor elevation (EL. 158 -5 ) to accommodate the new access to the DPF s platform. (ii) A staircase will be attached to the new platform on the North side to facilitate access to the existing platform. (iii) A ladder will be installed on the South side to serve as an additional access point to the existing platform. 13) A platform for SCR (Selective Catalytic Reduction) equipment, including a 3ft wide maintenance area, will be installed approximately 4 ft above the existing platform. A ship ladder will be affixed to allow access to the maintenance area. 14) Safety guardrails will be installed around the service platform as per applicable safety standards and regulations to ensure the safety of personnel working on or around the platform. 14) The service platform will be supported by posts on the North wall side, while hangers will be used on the other side to ensure structural stability. Lateral supports and bracings will be installed for bracing the platform to move horizontally. 15) A blast catch system shall be adapted for the overhead rollup door of the generator room to mitigate the effects of an explosion. 16) The blast catch system's curtain shall be anchored to the existing floor slab at the bottom of the curtain to prevent the system from moving during an explosion. 17) A couple of pipes shall penetrate the north exterior wall of the generator room. As the pipes are relatively close to each other, top three courses of the CMU wall shall be removed for the pipe penetration. The opening shall be grouted, and the wall shall be reinforced with a C8 channel steel and braced back to the radiator floor frame. 18) The Motor Pool Building will be partially demolished for the new Switchgear Building (SGB). Sheet piles will be utilized for foundation excavation. 19) The new Electrical Switchgear Building (ESGB) will be a steel-framed structure. The steel frame will consist of moment connection frames in the South-North and East-West direction respectively to resist lateral loads such as wind, seismic, and blast loads. 20) For blast protection purposes, a high parapet will be provided on the three exterior sides of the building. The height of the parapet will be the same as that of the radiators. 21) The load bank will be located on the opposite side of the drive from the ESGB. 22) A retaining wall will be adopted for developing a flat area for locating the load bank. The exterior mat foundation will be used for supporting the load bank. 23) The backfill under the mat foundation shall be 95% engineering compacted fill. 24) In accordance with Section 1704 of the international building code, and all applicable state and local requirements, the Contractor shall contract with an independent approved agency to make periodic and/or continuous inspections of the construction progress in accordance with the following requirements: Steel Construction Section 1705.2 Concrete Construction Section 1705.3, Table 1705.3 ARCHITECTURAL 1) Demolition of the southern (plan west) portion of the one-story Motor Pool Building (Building 113) corresponding with Storage, Bathroom and Office approximately 1,000 sq. ft. The Storage area will be permanently removed, while the Bathroom and Office area (approximately 390 sq. ft.) will be rebuilt after structural modifications are complete. 2) The existing drywall partition at the Motor Pool Storage room will be the location of a new demising wall between the proposed addition and the remaining Motor Pool structure. The demising wall will be a load-bearing concrete masonry wall on concrete foundation with furred gypsum board on the Office and Bathroom side. Structural work includes a new steel framed roof, and concrete slab. The Office and Bathroom will be recreated. Finishes, doors, and windows include the following: (i) Painted walls. Office and Bathroom walls will be gypsum board over metal studs. (ii) Porcelain tile floors and ceramic tile wainscot in the Bathroom. (iii) Prefabricated shower stall, toilet fixture and accessories in the Bathroom. (iv) Vinyl floor tile with 4 high rubber base in the Office. (v) Acoustic panel ceilings in the Office and Bathroom. The open shop ceiling will be exposed structure. (vi) Wood doors on hollow metal frames. (vii) Office interior windows tempered glass in hollow metal frames. 3) Existing Generator and Switchgear Rooms: Several doors will be replaced including the overhead coiling door, exterior exit door, and doors at the exiting switchgear room. To meet blast resistance requirements, the new insulated coiling door will have a blast curtain catchment system located behind. Other doors will be blasting resistance. A door will be added between the Generator Room and the new addition to allow for staff access between these spaces. The Generator Room walls, and floor will be repainted. 4) Addition Construction: One-story addition on the south (plan west) side of the Motor Pool Building to house electric switchgear, and cooling towers on the roof. The addition will be approximately 1,070 sq. ft. with reinforced concrete masonry exterior walls, steel framed, concrete slab-on-grade, and steel roof deck. The masonry exterior walls extend above the roof to shield the cooling towers. New structure (columns and roof) will be 1-hour fire rated. 5) The floor of the addition will align with the existing Motor Pool floor elevation. Due to the sloping site, a stair and elevated walk will be required at entries to the addition. 6) Exterior walls and the roof screen of the addition are designed to be blast resistant. Exterior wall cladding will be 2-inch-thick insulated metal panels (R-16) over 1-inch girts. Insulated panels will extend at least 24 below the finished floor elevation to provide slab edge insulation. At the masonry screen wall (above the roof) metal panels will be uninsulated. 7) The addition will have two exterior doors. Double doors on the west (plan north) side for staff and equipment access, and a secondary exit on the south (plan west) side. Exterior doors will be hollow metal 14-gauge for blast resistance. 8) The existing built-up Motor Pool roof will be replaced with a new cold applied SBS modified bituminous roof system with R-30 insulation. The addition will have a similar new roof system with tapered insulation (R-30 average) & flashing work at curbs and penetrations for equipment. To avoid roof drains over electrical equipment, the new roof will drain to scuppers and downspouts on the north and south sides. The roof will be accessed from an interior ladder and roof scuttle. 9) The stairs will have steel pipe guardrails and handrails suitable for non-public use. 10) The addition will have (RES-2) Stonhard epoxy flooring, rubber base, and painted concrete masonry walls. The ceiling will be exposed structure with spray fireproofing. Column enclosures will be gypsum board over metal studs to achieve the required fire rating. 11) Wall mounted fire extinguishers will be provided by the VA in locations indicated on the drawings. Similar to the existing, fire extinguisher cabinets will not be needed. FIRE SUPPRESSION AND FIRE ALARM 1) Modify the existing Simplex fire alarm system and install new notification and initiation devices in accordance with the project codes and VA TIL. 2) Provide extension of the existing wet-pipe system for the main switchgear room including drip pans below sprinkler piping and head guards. Piping will be located in equipment corridors (not above electrical equipment). FIRE SUPPRESSION SYSTEM 1) The existing fire suppression system will be modified based upon the project scope of work. The existing wet pipe system will be modified to provide code compliant protection of the existing project scope areas and will be extended to provide protection in the new switchgear room addition. 2) The required fire flows and pressures for buildings provided with automatic sprinkler protection shall comply with NFPA 13 and other applicable NFPA standards. A minimum hose stream allowance for total combined inside and outside firefighting to be provided to comply with NFPA 13. 3) The local responding fire department will provide the necessary flow and pressure for manual firefighting operations. VA occupied buildings are required to have sprinkler protection. A wet pipe automatic sprinkler system in accordance with NFPA 13, except as indicated in the VA Fire Protection Design Manual, will be provided to protect all areas of the building. Sprinkler protection shall be provided in all spaces including, but not limited to, elevator machine rooms, walk-in freezers and cold rooms, computer rooms, telephone switch rooms, radiology and MRI suites, loading docks, electrical rooms, plumbing or utility closets, audiometric booths, paint spray booths, dry type lint collectors, dust collectors, and generator rooms. Sprinklers are not required where specifically exempted by NFPA 13 and the VA Fire Protection Design Manual. A flow switch, isolation valve, tamper switch, and pressure gage shall be provided for each zone. System status will be annunciated on the fire alarm control panel with signaling to the fire alarm reporting system. Drainpipes for each sprinkler riser and test connection shall be routed to the building exterior to facilitate testing. Drains shall not terminate at service sinks. Drain piping shall be 2-inch minimum to accommodate discharge from full flow tests at maximum system pressure. Sprinkler systems shall be hydraulically calculated by any design approach allowed by NFPA 13, except that the Special Design Approach shall not be used in health care. Pipe schedule systems may be used for extension of existing pipe schedule systems where the water supply is adequate. A safety factor of 10% for each sprinkler demand including required hose streams shall be included. Sprinkler densities shall comply with NFPA 13 and the VAFPDM except in rooms containing moveable/mobile shelving (high density storage) where the density shall be Ordinary Hazard (Group 2). Quick response sprinkler shall be installed in all areas, except where specifically prohibited or noted elsewhere in the VA Fire Protection Design Manual. Sprinklers shall be Factory Mutual (FM) approved as quick response except as identified below: (i) Concealed sprinklers that are UL listed quick response and FM approved standard response are permitted in clean rooms provided that the rooms are not designed under negative pressure. (ii) Concealed sprinklers that are UL Listed quick response and FM approved standard response may be used with the approval of the VHA Central Office Fire Protection Engineer. (iii) FM approved standard response sprinklers shall be permitted where quick response sprinklers are prohibited. FIRE ALARM SYSTEM The existing fire alarm system will be modified for the project scope of work. New manual pull stations will be provided near the exits in the new switchgear room. New alarm devices will be provided throughout the project scope area to comply with NFPA 72 and the VA Fire Protection Design Manual. General Evacuation 1) Provide audible notification appliances to be heard in all locations throughout the project scope area. Provide visible notification appliances in all publicly accessible areas of the building such as corridors, auditoriums, cafeterias, open assembly rooms 750 SF, canteens, retail stores, etc. Flash rate shall not exceed one flash per second for visible appliances. Strobes that operate on adjacent zones on each floor shall be synchronized with one another as required by NFPA 72. Visible notification appliances are not required in the following spaces which are not considered to be public accessible: (i) Individual office spaces unless the space is known to have a hearing-impaired person stationed there (ii) Closets (janitors clothes, etc.) (iii) Utility shafts (iv) Crawl spaces (v) Normally unoccupied rooms 100 SF (vi) Normally unoccupied storage spaces where no regular activities take place other than placement and retrieval of storage (vii) Stairway enclosures and elevators (viii) Patient exam/treatment rooms F. Special Requirements 1) Where smoke detectors are required, they shall be photoelectric type only. Duct detectors are to be installed only where required by NFPA 101 or NFPA 90A. Where a duct smoke detector is located above a ceiling or in a difficult to reach location, provide a remote indicating lamp and test key switch on nearby wall at 7-feet AFF to facilitate testing. G. Carbon Monoxide Detection 1) Carbon monoxide detection shall be provided as required by NFPA 101. PLUMBING 1) Remove all the existing restroom plumbing fixtures and associated appurtenances including water closet, lavatory, shower, and emergency shower. 2) Remove existing roof drains. 3) Remove existing water heater and associated appurtenances. 4) All storm drain, domestic water, sanitary and vent piping shall be removed back to mains and capped. 5) Remove existing eye wash, salvage for re-installation. Provide portable eye wash during construction. 6) Provide temporary plumbing to serve restrooms fixtures in construction trailer. Contractor to verify route temporary piping and connections to plumbing mains. 7) Provide plumbing fixtures and associated appurtenances including water closet, lavatory, shower in the new second floor restroom. 8) Re-install emergency eye wash in motor pool room. 9) Connect new plumbing piping from mains to new fixtures. Provide appropriate isolation valves and wheel stops at all fixtures. 10) Provide a new 20-gallon electric water heater to serve new lavatory, shower, and emergency shower. 11) Provide new roof drains and storm drainage piping for the motor pool building area. Connect new piping to existing. 12) Provide downspout boots at new downspout locations on the new electrical switchgear addition. Connect new piping to below grade site drainage system. MECHANICAL 1) Demolish the two (2) existing 4160-volt generators and their appurtenances and replace them with two new (2) 2.8-MW Tier 4F generators, including the exhaust systems, fuel oil systems, generator cooling systems and compressed air system. The contractor shall be responsible for loading these generators up from the warehouse/manufacture where they are stored/being worked on and transporting them to the job site. 2) Two (2) new generators and all their appurtenances will be provided, including a new generator flue stack for each genset. Each flue stack will be comprised, but not limited to 26 black steel with 3 calcium silicate insulation with canvas jacket, a diesel particulate filter (DPF), a mixing duct, a selective catalytic reduction (SCR) system, expansion joints. Two (2) new aqueous urea tank systems will be provided to mitigate NOx levels of the generator exhaust to comply with TIER 4 Requirements. 3) Demolish the existing heating and ventilating unit, HV-2 and ventilating unit HV-3 serving the generator room and its appurtenances including the ductwork system and steam and condensate return piping. The existing intake louver associated with the heating and ventilating units, will remain and be reused for the new combustion and ventilation air systems. The heating and ventilating unit, HV-1 serving the Central Plant and Switch Gear Room and its appurtenances, including the ductwork and chilled water coil/piping systems will remain. 4) The existing unit heaters and their appurtenances serving the Generator Room, including the steam and condensate return piping will be demolished. New increased capacity steam unit heaters will be provided to accommodate the combustion air intake airflow amounts for the new generator operation requirements. 5) Provide a new combination combustion / ventilation supply and cooling exhaust air systems for the Generator Room to accommodate both on-and-off times, as well as individual generator operation. 6) The existing steam heaters in the generators room shall be demolished. 7) A large fan is located on a mezzanine level above the generator room. This fan shall be replaced as part of this project in order to provide the proper level of cooling to the generator room. 4) The Generators must meet Tier 4 exhaust requirements, thus a Tier 4 exhaust system is included in the project. The system included a Selective Catalyst Reduction Unit (SCR) and a Diesel Particulate Filter (DPF). The existing catwalk will be expanded/reconfigured to provide access to the new Tier-4 exhaust and HVAC combustion/ventilation equipment. 5) The existing 3-inch high-pressure steam and 1-1/2 pumped condensate serving building 16, currently drops down into an existing pit in the Generator Room and then exits building 101 underground in a conduit that runs over to building 16. The steam and condensate lines will be removed within the generator room, pit and 5 feet beyond the footprint of the new Motor Pool building foundation. 6) There two (2) existing duplex condensate pump and receivers in the Generator Room. The one on the plan north wall serves the existing cooling tower basin heater, which are being demolished. Thus, the steam and condensate piping and the condensate pump will be demolished. The condensate receiver tank and duplex pump on the plan south wall will remain as is to return condensate from the steam unit heaters back to the boiler plant. 7) The exhaust fans will be Greenheck tube axial type, model # AX with a 50,500 CFM capacity per fan and a total of two (2) fans. Each fan will be provided with and controlled by a VFD via the Engineering Control Center (ECC). 8). The (2) supply fans will be Greenheck tube axial type, model # AX with a 25,000 CFM capacity per fan and a total of four (4) fans. Each fan will be provided with and controlled by a VFD via the ECC. 9) The (2) generator exhaust fans, (4) supply fans and their associated dampers will connect into the controls for the engine generators. 10) Two new 330-gallon day tanks, with integral transfer pumps, shall be installed for each generator. Day tanks shall be reconnected to existing fuel oil piping leading back to the existing 30,000-gallon underground fuel tank. Additionally, a new fuel oil maintenance and cleaning system will be provided and located in the Generator Room. The fuel oil maintenance system will be piped to the existing fuel oil piping just inside the building. Control valves will control the operation of the fuel oil maintenance skid. 11) A new direct current battery start package will be provided to start the generator engine. 12) All new equipment requiring automated controls will be integrated with the existing nearby boiler room ECC and local controller point capacity and wiring extended as required to accommodate the new scope. 13) Inspect, test, and polish the fuel for Underground storage Tank 30,000 gallons that serves the EMD in accordance with NFPA and manufacturer recommendations. ELECTRICAL A. The following systems will be modified to suit the electrical demands of the renovation: 1) Electrical Distribution (4160/2400V, 3PH, 4W) (480/277V, 3PH, 4W) and (208/120V, 3PH, 4W) 2) Fire Alarm System 3) Communications and IT Systems 4) MCC-3A shall be demolished as part of this project. 5) contractor shall be responsible for loading this equipment up from the warehouse where they are stored and transporting them to the job site. All eight sections of switchgear shall be delivered to the site: (1) Master/Bus PT section, (3) generator input circuit breaker sections, (4) stacked distribution circuit breakers sections. 6) The VA has requested that H.O. Penn, who is currently responsible for storing the equipment, prepare and re-commission the generators and paralleling switchgear for transit and certify the condition of the equipment prior to delivery. 7) After all of the demolition of the equipment, piping, and gear in Generator Room GK04, the new generators shall be set on the existing/extended concrete pads. 8) New generator system status panels shall be installed in three locations within the hospital: Switchgear Room GM04, the boiler plant main office, and the VA police office. Each panel shall be tied back to generator control panel via fiber optic cable pair. 9) A new load bank shall be provided for the generators. Load bank will be set on structural piers across the driveway from the Switchgear Room GM04. A concrete encased duct bank shall be constructed to route conduit from switchgear room to load bank. Existing tree shall be removed, and hill shall be prepared as required for installation of load bank. 10) A generator tap box shall be installed adjacent to the load bank. The tap box will be connected to one of the generator input circuit breakers in the paralleling switchgear. 11) The ASCO paralleling switchgear shall be installed in the newly built switchgear room adjacent to the existing Motor Pool Building. Feeders shall be installed between each generator circuit breakers and the incoming generator breakers within the paralleling switchgear. After the generators and paralleling switchgear are fully installed and tested, new 5 conduits shall be run from the existing medium voltage ConEd utility switchgear to the new utility input circuit breakers within the paralleling gear. The four utility services can they be cut over to the paralleling switchgear in stages, utilizing the existing sync bus to keep all of the loads online. 12) The paralleling gear will need to be modified as required by one of the pre approved subcontractor to support the new program, including adding interlocks, updating the processor and programming, etc. Potential transformers shall be added to each of the utility circuit breakers. This will be done by adding an ASCO top hat mounted to the top of the gear above each of the four utility breakers. 13) Contractor shall provide and install a new 16 high pullbox on top of each of the four top hats. The feeders from the medium voltage switchgear shall terminate to the side of these pullboxes. The cables shall then be routed down into the top of the new ASCO PT top hats . 14) Controls will stage the utility feeds into the new switchgear as required so that the 50-kAIC withstand rating of the paralleling switchgear bus is sufficient. 15) The controls shall also be programmed to run load bank testing, to send signals to the existing 480-demand response program. This program requires the generators to run upon notification from ConEd to remove the hospital from its electric grid. The program generates credits back to the VA. See Drawing E-602 for further information on this sequencing. 16) ASCO remote terminal I/O units shall be provided in existing Switchgear Room GK05 and within the rooms that house the existing 480-volt ATS s that run the emergency system. Cabling or fiber shall be run from these I/O units back to the master controlsection of the paralleling gear. This system will handle the communication to the existing emergency 480-volt emergency system. 17) The bus duct currently servicing MCC-3A shall be cut back to a convenient overhead point and new cable tap box shall be installed at the end. From this tap box, feeders in conduit shall be extended down to a new 800-amp, 480-volt Panelboard E3A that will be installed in the previous location of MCC-3A. This panel shall feed the motor pool shed, the new cooling towers, the new mechanical fans, generator cooling towers and all other 480-volt loads required for the generators. 18) All new mechanical equipment, that will be selected to cool the generator room and motor pool building, will be tied to the new 800-amp panel. Locally mounted VFDs shall be provided as required. 19) If new circuit breakers are required to be installed within existing equipment, they shall match the existing circuit breaker s type and AIC rating. 20) Existing 120-volt, 20-amp circuits that currently feed existing mechanical units receptacles shall be reused for new unit. 21) New control panels shall be provided with new 120V, 20A, 1-pole circuit breaker installed in existing space in existing branch circuit panels. 22) A new security gate shall be provided across from the existing Fisher House to increase the physical security of the vehicular pathway to the new switchgear room. Two-way motorized security gates shall be actuated by dual authenticating card readers and shall be monitored by a license plate camera. All power and security/data wiring shall be routed back to the power source panel and new security headend in the Fisher House via a new concrete encased duct bank. Care must be taken when digging in this area and use of ground penetrating radar by the contractor shall be required. It`s the responsibility of the contractor to install the security gate, locate a panel to feed the gate and all rocks should be included as a part of this scope. 23) The VA determ...
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/842c0b5518834d4b8bb4c0206d11935e/view)
 
Place of Performance
Address: James J. Peters DVA Medical Center, 130 W. Kingsbridge Road, Bronx, NY 10468, USA
Zip Code: 10468
Country: USA
 
Record
SN07474380-F 20250613/250611230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.