Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 14, 2025 SAM #8601
SOLICITATION NOTICE

W -- NTC 25-09 Requirement - Light Sets x 64

Notice Date
6/12/2025 11:09:20 AM
 
Notice Type
Solicitation
 
NAICS
532490 — Other Commercial and Industrial Machinery and Equipment Rental and Leasing
 
Contracting Office
W7M2 USPFO ACTIVITY FLANG 125 JACKSONVILLE FL 32218-7933 USA
 
ZIP Code
32218-7933
 
Solicitation Number
W911YN25QA026
 
Response Due
6/19/2025 7:00:00 AM
 
Archive Date
07/04/2025
 
Point of Contact
TSgt Jonathan Acree, Phone: 9047417441, Katie M Perna, Phone: 9047417440
 
E-Mail Address
jonathan.acree@us.af.mil, katie.m.perna.mil@mail.mil
(jonathan.acree@us.af.mil, katie.m.perna.mil@mail.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Short Notice Requirement for NTC 25-09. The 53rd IBCT requires the renting of six (64) light towers The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, maintain, tear down, and remove Light Towers at Fort Irwin, CA. Prior to arrival, coordinate with Government Representative. . The Light Towers must be equipped with a towing pintle capable of being attached to a standard military High Mobility Multipurpose Wheeled Vehicle (HMMWV). The contractor can use an interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than the day prior to the start of each POP. The contractor shall ensure the light output meets or exceeds 4,000 Lumens. If diesel operated, the contractor shall ensure the light bulbs have a total power output of no less than 4kW and a total power output for the generator of no less than 6kW. The contractor shall ensure the Light Towers run on Ultra Low Sulfur Diesel (ULSD) OR Solar. If using Diesel Operated power, equipment must be compatible with ULSD fuel. Government will provide ULSD fuel. The contractor shall label each piece of equipment next to the fuel tank with the wording ""Diesel Fuel Only"" IF APPLICABLE. Failure to label accordingly will invalidate contractor claims regarding use of incorrect fuel. The contractor shall ensure all Light Towers are delivered with all necessary parts in accordance with(IAW) the operators' manual and generators must have a full tank of fuel (diesel operated) or fully charged (solar). The Government will not be responsible for returning equipment with a full tank of gas or paying to refuel the equipment at the end of the Period of Performance. The government will also not be responsible solar operated light sets that are not charged. The contractor shall have 24 hour services and be capable of makinga light set solution operational within 8 hours of a service call. All backup units utilized in the event of primary failure shall be at no additionalcost to the Government.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/af3e94e6e4cb4ba495285c51219e267b/view)
 
Place of Performance
Address: Fort Irwin, CA 92310, USA
Zip Code: 92310
Country: USA
 
Record
SN07475565-F 20250614/250612230039 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.