Z -- Repair Fire Doors - Construction Project #565-25-101

Notice Date
6/24/2025 12:21:52 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
246-NETWORK CONTRACTING OFFICE 6 (36C246) HAMPTON VA 23667 USA
 
ZIP Code
23667
 
Solicitation Number
36C24625Q0801
 
Response Due
7/24/2025 10:00:00 AM
 
Archive Date
10/31/2025
 
Point of Contact
Elaine B Belber, Contract Specialist
 
E-Mail Address
Elaine.Belber@va.gov
(Elaine.Belber@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
STATEMENT OF WORK Repair Fire Doors Project: 565-25-101 Construction Services VAMC Fayetteville, NC SCOPE OF WORK: This project will repair fire and smoke doors located in Building nos. 1 and 3 at the VA Medical Center located at 2300 Ramsey Street, Fayetteville, NC 28301. The work will require door specialists, electricians, wall finishers, and laborers. It is highly recommended that all offerors attend the scheduled site visit walk through to note wall types, existing conditions, required hardware, take rough measurements, etc., necessary for proper offers. Construction will be done in accordance with VA specifications, Design guides, Infection Control guidelines and all applicable codes. VA Standards shall be retrieved from the Office of Construction and Facilities Management website (https://www.cfm.va.gov/til/index.asp). Construction will also be structured to require minimum interruption of space function during construction. The door numbers and work to be completed are as follows: Building no. 1 Basement Floor Room B39 (Soiled Linen) Two-hour fire rating. Provide frame label/re-certify. Room B85 (Linen Chute) Two-hour fire rating. Provide frame label/re-certify. Second Floor Room 2055 (Anesthesia) One-hour fire rating. Provide door label/re-certify. Note that it is a new door and frame so the door label was likely covered by the continuous hinge. Third Floor Room 379 (Stairwell) - Two-hour fire rating. Provide frame label/re-certify. Add door sweep. Fourth Floor Room 419 (Soiled Utility) - One-hour fire rating. Provide frame and door labels/re-certify. Note that it is a new door and frame so the labels were likely covered by the continuous hinge. Building no. 3 Basement Floor Room B05 (Exterior) Two-hour fire rating. Demolition (see note below). Replace metal doors and frame for correct egress (outward). Install new closers, panic bars, lockset, vision lites (large in each door and above doors). Reconnect to maglock and card readers. The existing maglock is operational and works on a schedule. Replace all hardware. Replace ADO push plate on the exterior. On the interior side, replace ADO push plate with wave to open sensor. Provide new controllers. Reinstall air curtain. Install panic bars with egress out. Eliminate electric strike function. Storage function leverset. Install new threshold, weatherstripping, and sweeps. Room B07 (Storage) Two-hour fire rating. Demolition (see note below). Replace wood doors and metal frame for correct egress (outward). Install new closers, panic bars, lockset/keypad. Room B10 (Electrical) - Two-hour fire rating. Demolition (see note below). Replace metal door and frame. Install new closer and lockset. Room 06L (Office) - Two-hour fire rating. Provide door and frame labels/re-certify. Room B06P (Corridor) - Two-hour fire rating. Demolition (see note below). Replace metal doors and frame. Install lockset, panic bars, closers. Install wave to open sensors instead of ADO push buttons. Must maintain same level of security and automation. First Floor Room 105 (Storage) - Two-hour fire rating. Demolition (see note below). Replace metal door and frame. Install new closer, lockset and cylindrical deadbolt. Reinstall maglock and card reader. Room 109 (Storage) - Two-hour fire rating. Provide frame label/re-certify. Second Floor Room 203B3 (Storage) - Two-hour fire rating. Replace wood door. Reinstall frame mounted door stop, add new closer and lockset. Dispose of door. Located between Building nos. 1 and 3 Basement Floor Door BX (exterior door to courtyard ramp) - Replace metal door and hardware located between buildings nos. 1 and 3. Install new metal door, rated sight glass, sweep, kick plates, maglock, card reader, door and wave to open sensor on the interior and ADO push plate on exterior. Notes: Demolition entails removal and disposal. Includes destructive actions of parts of block, plaster and/or gypsum walls. Walls to be refinished to match existing walls. Infection control measures must be taken as directed by VA (assume plastic barriers, air scrubber, sticky mat, and covered carts). For the frame and door labels, they shall be metal (i.e., not a sticker). Panic bars shall be UL-Listed fire exit devices. Contractor to plan on doing one door at a time. The VA may consider allowing more than one door worked on at a time. For it to be considered, the contractor must have a well-developed plan and adequate personnel to complete the work as quickly as possible. Life safety (stairwell door, path of egress) will be scrutinized. There is considerable distance between each door location. SCHEDULE: Contractor to complete construction within 150 calendar days of the Notice to Proceed. This should allow sufficient time for submittals and material lead times, as well as actual construction. WORKING HOURS: Frame labeling/re-certifying can happen during normal working hours (e.g., 0730-1700). Demolition and construction work shall be performed after normal working hours (e.g,. 1700-0700). COR may allow some exceptions if VA Safety and Infection Control offices allow (e.g., painting, finishing). SCHEDULED SITE VISIT: This SOW doesn t contain all the necessary information for contractors to prepare proper offers. Therefore, the schedule site visit walk-through is highly recommended. There interested offerors are to record the wall types; take rough measurements; note existing door operators, hardware, etc.; observe surroundings and visualize necessary infection control measures. A VA Locksmith will be part of the site visit to assist in answering questions onsite. BADGING: The VA will provide contractors temporary badging. All badges shall be returned to the VA. MEETINGS: Bi-weekly progress meetings will follow the Notice to Proceed. Weekly meetings will commence once a materials delivery date is established. ATTACHMENTS: See attached document: Repair Fire Doors Project 565-25-101 Specifications. See attached document: Repair Fire Doors Project 565-25 101 Photos of Doors. (End Statement of Work)
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6e9f58e8addd453e8776ff7ed3532e49/view)
 
Place of Performance
Address: Fayetteville, NC 28301, USA
Zip Code: 28301
Country: USA
 
Record
SN07487002-F 20250626/250624230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.