SOLICITATION NOTICE
59 -- FMS REPAIR REQUIREMENT FOR THE UK
- Notice Date
- 7/14/2025 12:57:24 PM
- Notice Type
- Solicitation
- NAICS
- 334412
— Bare Printed Circuit Board Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N00383-25-Q-014A
- Response Due
- 7/29/2025 1:30:00 PM
- Archive Date
- 08/13/2025
- Point of Contact
- JOHN A. MAIER, N723.10, PHONE (215)697-2782, EMAIL JOHN.A.MAIER@NAVY.MIL
- E-Mail Address
-
JOHN.A.MAIER@NAVY.MIL
(JOHN.A.MAIER@NAVY.MIL)
- Description
- This requirement is for the repair of the items herein this solicitation.\\ Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor�s facility as reflected in the Action Date entry in the commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. \\ The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.\\\\\\\ Required RTAT: ## ____ days after receipt of asset.\\ Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. \\ Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. \\\\\\\\\\\\\\\ Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/820ceebeb5c746fcb3517639fabe4f53/view)
- Place of Performance
- Address: Philadelphia, PA 19111, USA
- Zip Code: 19111
- Country: USA
- Zip Code: 19111
- Record
- SN07508505-F 20250716/250714230050 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |