Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 18, 2025 SAM #8635
MODIFICATION

Z -- Y1AA--656-19-324 Upgrade Physical Access Control System (PACS) 36C263-25-AP-3085

Notice Date
7/16/2025 5:10:19 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
NETWORK CONTRACT OFFICE 23 (36C263) Saint Paul MN 55101 USA
 
ZIP Code
55101
 
Solicitation Number
36C26325B0021
 
Response Due
8/12/2025 12:00:00 PM
 
Archive Date
12/31/2025
 
Point of Contact
Dwayne Brauch, Phone: 6512933039
 
E-Mail Address
dwayne.brauch@va.gov
(dwayne.brauch@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business Set Aside
 
Description
The contractor shall provide all necessary labor, materials, tools, and equipment to support the campus-wide upgrade of the Physical Access Control System (PACS). This project includes the installation of new card access hardware, software, card readers, and door card hardware at designated existing openings as indicated in the project drawings. The scope of work includes the replacement of existing PACS devices along with the modification or relocation of utilities, architectural elements, and electrical systems to accommodate the new installations. The upgraded system will include high-priority biometric card readers, card key and keyed pad door controllers, and a new PC-based server to manage access control functions. The new PACS system must fully integrate all existing PACS devices and allow them to be incorporated into a unified control system. The project requires demolition, alterations, and utility relocations as necessary to facilitate the installation of the new PACS system. Architectural and electrical modifications will also be performed to ensure system compatibility. All construction activities must be scheduled and phased to minimize disruption to staff and daily operations, while also adhering to infection control measures throughout the project duration. To ensure full system integration and operability, the contractor must test all PACS devices and network connections both functionally and operationally after installation. All work must comply with the project specifications, contract drawings, and applicable local, state, federal, and national codes, and regulations. The contractor must also adhere to all VA directives, design guides, and manuals to ensure compliance with regulatory requirements and project standards. Period of Performance is 495 days.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2784de4667764ba08a9dce1163c660a5/view)
 
Place of Performance
Address: Saint Cloud, MN 56303, USA
Zip Code: 56303
Country: USA
 
Record
SN07511127-F 20250718/250716230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.