Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 18, 2025 SAM #8635
SPECIAL NOTICE

J -- USCGC Aspen reduction Gear

Notice Date
7/16/2025 9:36:39 AM
 
Notice Type
Special Notice
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z08525Q0020647
 
Response Due
7/21/2025 8:00:00 AM
 
Archive Date
08/05/2025
 
Point of Contact
Justin Wooldridge, Phone: 2068205327, Lindsay Mongiovi, Phone: 5716086752
 
E-Mail Address
justin.r.wooldridge2@uscg.mil, lindsay.n.mongiovi@uscg.mil
(justin.r.wooldridge2@uscg.mil, lindsay.n.mongiovi@uscg.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
USCGC ASPEN reduction gear. This is posting for informational purposes only this has been award VIA JOTFOC. UPDATED POP: 28July25 Please see attachements for SOW with images. Reduction Gear Tech Services USCGC ASPEN (WLB 208) Inadequate Generator Pinion Flow from Spray Nozzle Repair and Seal Replacement Background, Problem Statement: Main Reduction Gear (MRG) Info: MFR ID 96-DHCMGH-CP B Class Model Gear Unit Reduction: NSN 3020-XF-C11-6019 Input RPM 900 Output RPM 254 Gear ration 3.541:1 Background: CGC ASPEN, completed an inspection of the LO System Flow from visible spray nozzles. After recent MRG failures the USCG is trying to identify any LO flow problems that can exacerbate the MRG aging issue prior to each Cutter�s scheduled future �Major Overhauls�. ASPEN, reported after their inspection: Poor flow and excessive aeration from Generator pinion spray nozzles. Problem Statement: Clear any blockage and restore normal spray patterns at/from Generator pinion 3 spray nozzles. Replace the following seals: Generator Pinion Shaft Seal, Port Quill Shaft Aft Seal, STBD Quill Shaft Aft Seal, LS Shaft Aft Seal. Below is the picture of ASPEN�s current flow to the generator pinion gear. The oil appears to be misted with excess air in the lines. Tasking: 2.1 All Tasking is Performance Based. USCG realizes that it does not make sense to instruct the OEM on how to perform work and repairs on their equipment. Rather it is better, to identify the problem/deficiency and identify the required end result desired to correct. Inspect all other teeth. Blue check contact. Set up a cleanliness boundary, to prevent any generated debris from entering the Internal gear box. Inspect all other teeth for damage or abnormal condition. Report and document any additional damage. Similar repairs are to be performed but if additional time is required USCG/Contractor will negotiate prior to that additional repair commencing. Perform tooth contact inspection (blue checks). Restore Generator Pinion spray nozzles to normal spray pattern/flow with acceptable amounts of aeration. Restore normal nozzle flow by any combination of escalating level of effort OEM methods. It is contemplated that any/all may be required: Attempt to blow out with air. Attempt to inject pressurized oil into spray bar external fitting. Force more LO pump flow (GPM) into subject nozzles, by capping off (temporarily) other flows/hosses) Ensure flow is balanced and nozzles are indeed blocked and not being starved of their required GPM by an unbalanced LO flow distribution. Remove Gen Pinion Upper Housing Cover to directly access nozzles. Then either clean/unblock directly the existing or renew. Contactor shall travel to work cite, with contingency replacement nozzles in the event they are required. Contractor shall have onsite a minimum of 03 replacement spray nozzles Part: 35000-0608 in the event nozzles need to be replaced. Ensure oil level dipstick is proper length with proper markings. Below is procedure used previously to remove cover. USCG Cutter crew will assist OEM Tech Rep as required in this evolution. PROCEDURE TO REMOVE UPPER COVER Remove Upper Generator Pinion Housing Cover Half to Access and clean Spray Nozzles Inside. 1. See Tech Pub Para 6.7.13 Turning Gear/Generator PTO Pinion Cover. (pages attached) 2. Following 6.7.13 as augmented by this SOW remove the Generator PTO Pinion Cover. 2.1. Disconnect Lube Oil Hoses. Cap/bag disconnected hose ends to prevent contamination. 2.2. Remove Breather Cap. 2.3. Remove Magnetic Pick-up Assemblies. Preserve/safeguard for reassembly. 2.4. Remove thru-cap (#108) at PTO end. 2.5. Disassemble the turning gear end as required to free cover and lift. Although TP says �Remove turning gear assembly and generator coupling� it may not be necessary just to remove upper cover of this SOW. 2.6. Remove all hold down fasteners. 2.7. Prepare cover for rigging. 2.8. As Soon as possible cover/close with suitable CLEAN heavy duty covering the Reduction Gear opening to prevent any debris or foreign object entry. Maintain boundary protection until cover is reinstalled. 2.9. Rig to landing area where cover internals can be hand cleaned, and spray nozzles removed/cleaned/and inspected. 2.10. In concurrence with Cutter�s EO that work is completed, rig the cover back into position. 2.11. Reconnect and torque all fasteners and remove items. 2.12. Torque values can be found in MPC WLB-225 M-A-16012 �MAIN REDUCTION GEAR (MRG) EXTERNAL HOUSING AND HOLD DOWN BOLTS INSP/CHK�. 2.13. Retorque the disturbed MRG pinion cover hold-down bolts after 50 hours of operation. Inspect all other teeth. Blue check contact. Supply and replace the following seals IAW Model � 96DHCMGH-CP Technical Manual: LS Shaft Aft Seal, P/N: Chicago Rawhide 1200255HDS2 Port Quill Shaft Aft Seal, P/N: Chicago Rawhide 86225 HDS3 STBD Quill Shaft Aft Seal, P/N: Chicago Rawhide 86225 HDS3 Generator Pinion Shaft Seal, P/N: UKN Provide written final report of the Tech Rep Visit Provide final report of the Tech Rep visit. Include noteworthy findings and discussion on events, documentation of final results, and any lesson learned for similar repairs to other WLBs. Delivery The CTR will travel to and perform work on board CGC ASPEN 4688 Homer Spit Rd. Homer, AK 99603 PERIOD of Performance The period of performance for this contract will be up to 7 days on site 8-hour days period during an agreed upon time between 07 JUL 25 and 01 AUG 25 PLACE OF PERFORMANCE & POC�s The primary place of performance will be onboard: CGC ASPEN (WLB 208) 4688 Homer Spit Rd. Homer, AK 99603 GOVERNMENT FURNISHED RESOURCES Technicians to support chain falling, lifting, interference removal and assistance with L/O analysis. Security Requirement Provide name of technician to crew prior to arrival and good contact information. Point of Contact: Any cutter site visits will be coordinated through the cutter POC. CWO Justin Schmidt CGC ASPEN (WLB 208) Pers Cell: 715-892-2824 Email: Justin.E.Schmidt@uscg.mil 6.2 Off site coordination: CWO Nathan Kirchner Work Cell: (216) 577-1230 Email: Nathan.P.Kirchner@uscg.mil
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0ab53c619b1849ec84f2ad5ee2d232a9/view)
 
Place of Performance
Address: Homer, AK 99603, USA
Zip Code: 99603
Country: USA
 
Record
SN07511209-F 20250718/250716230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.