Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 30, 2025 SAM #8647
SOLICITATION NOTICE

Y -- NM FS 220(1), Romero Creek Bridge

Notice Date
7/28/2025 11:21:17 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF25B000012
 
Response Due
8/12/2025 1:00:00 PM
 
Archive Date
08/27/2025
 
Point of Contact
Laura Vallejos, Leslie Karsten
 
E-Mail Address
CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. PROJECT NUMBER: NM FS 220(1) PROJECT NAME: Romero Creek Bridge PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2� to 10�). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge�s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 250 CUYD of Embankment Construction 250 TON of Roadway Aggregate 100 TON of Asphalt Pavement 14-ft x 48-ft of Prefabricated Steel Bridge 50 CUYD of Structural Concrete 200 LNFT of Guardrail, including terminals 100 hours of Equipment Hours 120 hours of Labor Hours It is anticipated this project will be advertised in Summer 2025 and be under construction in the Fall of 2025. The project has an estimated completion date of Fall 2026. Due to weather, no onsite work is to occur from early March to early May. ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0b9e77c9005d453981ca8dc84fd2ec90/view)
 
Place of Performance
Address: Luna, NM 87824, USA
Zip Code: 87824
Country: USA
 
Record
SN07526377-F 20250730/250728230112 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.