Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 30, 2025 SAM #8647
SOLICITATION NOTICE

Z -- Forest Service -Tropical Storm Hilary Damage Repair

Notice Date
7/28/2025 9:47:57 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA-FS, CSA SOUTHWEST 6 Albuquerque NM 871023498 USA
 
ZIP Code
871023498
 
Solicitation Number
127EAW25R0056
 
Response Due
8/12/2025 10:00:00 AM
 
Archive Date
08/27/2025
 
Point of Contact
Tanya Torres
 
E-Mail Address
tanya.torres@usda.gov
(tanya.torres@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This pre-solicitation notice is issued for informational purposes only to inform industry of an upcoming project requirement that will be solicited. This is NOT a Request for Proposal (RFP). At this time, no solicitation exists; therefore, please do NOT request a copy of the solicitation, bid documents, specifications, or drawings. Responses or proposals are not required at this stage. The USDA Forest Service Procurement and Property Services, Field Procurement Operations, Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to provide road repairs to various locations on the San Bernardino National Forest. Forest Service Roads 1N02, 1N05, and 1N17, which were damaged by Tropical Storm Hilary. For Road No. 1N02, the work involves removing and replacing asphalt concrete, conducting excavation and embankment construction, placing an aggregate base, and installing grouted riprap. Road No. 1N05 requires debris removal, road grading, excavation and embankment construction, installation of rolling dips, and the removal and installation of a corrugated metal spillway assembly. For Road No. 1N17, the tasks include debris removal, excavation and embankment construction, placing an aggregate base, roadway obliteration, and placing asphalt concrete. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, non-personal services, and all items necessary to perform the project work and associated contract requirements. All work must be performed in strict compliance with the terms, specifications, drawings, and provisions outlined in the contract. See Attachment for additional information.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/628151383e4a41559e2de8ac21ff8dca/view)
 
Place of Performance
Address: CA, USA
Country: USA
 
Record
SN07526460-F 20250730/250728230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.