Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 02, 2025 SAM #8650
SOLICITATION NOTICE

Z -- Point Mugu Revetment Repair Project

Notice Date
7/31/2025 3:59:57 PM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W075 ENDIST LOS ANGELES LOS ANGELES CA 90017-3409 USA
 
ZIP Code
90017-3409
 
Solicitation Number
W912PL25BA010
 
Response Due
9/10/2025 2:00:00 PM
 
Archive Date
09/25/2025
 
Point of Contact
MAJ John Hohng, Patricia Bonilla, Phone: 2134523255
 
E-Mail Address
john.hohng@usace.army.mil, patricia.b.bonilla@usace.army.mil
(john.hohng@usace.army.mil, patricia.b.bonilla@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Please be advised: The minimum advance notice for submitting visitor base pass request changed from 14 days to 10 days. A PDF copy of SECNAV Form 5512/1 is also attached with this pre-solicitation notice. ----------------------- Be advised that this is only a pre-solicitation notice. This notice does not commit the government to a solicitation nor is it a request for proposals or an invitation for bids. The project is a land-based repair effort to restore approximately 2,100 linear feet of the Central Revetment (34.095760� N, 119.109558� W). The revetment slopes will be restored with gradients of 1.5H:1V to 2H:1V. The project will increase the revetment crest to a design elevation between +20 and +23 feet (NAVD88) from the existing central revetment elevation, which currently ranges from +13 to +23 feet. The seaward slope will be reinforced with a minimum of two layers of estimated 6 to 8 ton armor stone, while the landward slope will utilize a minimum of two layers of estimated 2 ton reset armor stone. Approximately 35,000 tons of new armor stone will be required. This acquisition will be issued as a Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation may be issued on or about 11 August 2025 with a tentative bid opening date of 10 September 2025. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml. The Government is not responsible for any loss of internet connectivity or for an offerors inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. This project is set-aside 100% for Small Business. In accordance with FAR 36.204(G) this project is projected to cost more than $10,000,000. CONTRACTOR REPONSIBILITY, PRE-AWARD SURVEY INFORMATION TO BE SUBMITTED WITH BID In accordance with FAR 9.103(a) ... contracts shall be awarded to responsible, prospective contractors only. In order to determine a contractors responsibility for purposes of contract award in accordance with FAR Part 9, a statement regarding previous experience in performing comparable work and information related to their business organization, financial resources, and/or plan to be used in performing the work is required. In accordance with FAR 9 Determination of responsibility of the offeror by the Contracting Officer, please provide the following information in order to perform a preaward survey on your firm: 1. List of projects completed for the past three years, including dollar value of each contract. 2. List of projects in progress, percentage of work completed, including dollar value of each contract. 3. The name and qualifications of the employee designated to act as the Project Superintendent/Manager for this contract. 4. Copy of latest financial statement 5. General description of your firm 6. Please include client information (Point of Contact: Name, telephone number) and/or past performance evaluations for projects listed in your Pre-Award Survey package. 7. Equipment to be used for the project. A site visit is planned for 11:00 a.m. on 21 August at Naval Air Station Point Mugu. Attendees must obtain access to the Navy installation by submitting applications for One-Day Passes from the Base Visitor Control Office at least 10 days prior to the site visit. Application includes: Submission of an individual SECNAV FORM 5512/1 for all personnel requiring access along with a consolidated spreadsheet listing personnel requiring access to the Navy Primary Contact via email at Jan.s.granade.civ@us.navy.mil. SECNAV FORM 5512/1 is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c71ef9db734d46b89baf3d49ad5fab48/view)
 
Place of Performance
Address: Point Mugu NAWC, CA, USA
Country: USA
 
Record
SN07531882-F 20250802/250801000106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.