SOLICITATION NOTICE
J -- Fire Alarm System Replacement, Mountain Home AFB
- Notice Date
- 10/16/2025 7:08:45 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- FA4897 366 CONS PKP MOUNTAIN HOME AFB ID 83648-5296 USA
- ZIP Code
- 83648-5296
- Solicitation Number
- FA489725R0008
- Response Due
- 12/1/2025 2:00:00 PM
- Archive Date
- 12/30/2025
- Point of Contact
- Cameron Smith, Phone: 2088280743, Konrad Zirkle, Phone: 2088286478
- E-Mail Address
-
cameron.smith.16@us.af.mil, konrad.zirkle.1@us.af.mil
(cameron.smith.16@us.af.mil, konrad.zirkle.1@us.af.mil)
- Small Business Set-Aside
- NONE No Set aside used
- Description
- Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all ""if applicable"" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on October 31st, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 7, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), November 28, 2025. Questions shall be directed to both POCs.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/5ad7bc725caa4a94a8a01f82464d11a1/view)
- Place of Performance
- Address: Mountain Home AFB, ID 83648, USA
- Zip Code: 83648
- Country: USA
- Zip Code: 83648
- Record
- SN07620623-F 20251018/251016230035 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |