Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 23, 2025 SAM #8732
SOLICITATION NOTICE

J -- BOILER PLANT SAFETY DEVICE TESTING

Notice Date
10/21/2025 7:39:19 AM
 
Notice Type
Solicitation
 
NAICS
541380 — Testing Laboratories
 
Contracting Office
246-NETWORK CONTRACTING OFFICE 6 (36C246) HAMPTON VA 23667 USA
 
ZIP Code
23667
 
Solicitation Number
36C24626Q0084
 
Response Due
10/23/2025 8:00:00 AM
 
Archive Date
11/22/2025
 
Point of Contact
Yanique Y Williams Chin, Contract Specialist
 
E-Mail Address
Yanique.WilliamsChin@va.gov
(Yanique.WilliamsChin@va.gov)
 
Awardee
null
 
Description
Answers in Response to Questions from Solicitation 36C24626Q0084 To ensure a full understanding of the requirement and accurate pricing, could you please confirm or provide clarification on which auxiliary systems and devices are to be included in the testing scope? For example, should this encompass feedwater systems, fuel oil systems, combustion air systems, deaerators, or other related equipment within the plant? *Boiler Type:� � Three 400HP Nebraska Water Tube Boilers with Mark-1 Burners Operated at 90PSI.� � *Fuel Type: Operates Primary- Natural Gas. Backup Fuel Type: #2 Diesel Fuel.� *Auxiliary Equipment: As stated in the VHA Directive 1810. � Includes all Systems Mentioned in the statement of Work under Special Qualifying Factors. Additionally, could you please provide any available details on the boilers themselves,� such as make, model, fuel type, or capacity so that we can ensure the proposed testing approach and instrumentation are fully compatible with the installed systems? Special Qualifying Factor: 6.10. Prospective Contractors are to provide proof of delivering similar services provided to other organizations and contact information to allow Contracting Officer a way to verify your organization is capable and or proficient to deliver to the government the expected results. This should include testing of various Boiler Safety Devices and Auxiliary Equipment. Please ensure that examples of prior performance can be verified. This require perspective contractor to be very familiar and proficient in identifying, Testing and Adjusting as necessary, all Boiler and Plant Safety Devices as identified in VHA Directive 1810. Examples: Purge air switches, Combustion Air Switches, Minimum pilot low gas switch testing setting, Furnace air switch, Gas Valve Proof of closure switches and ASDPS, just to name a few. Prospective Contractor to Verify that they have all required Tools, Gages and all Testing Equipment necessary to accomplish requirements of this solicitation.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/189b399dffa1411198e8ece7e06c4f9e/view)
 
Record
SN07623850-F 20251023/251021230040 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.