SOLICITATION NOTICE

J -- USCGC Gasconade SSDG Control Panel replacement

Notice Date
12/23/2025 10:51:22 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z08526Q0002157
 
Response Due
1/6/2026 8:00:00 AM
 
Archive Date
01/21/2026
 
Point of Contact
DONNA O'NEAL, Phone: 5103931145, Lindsay Mongiovi, Phone: 5716086752
 
E-Mail Address
Donna.J.O'Neal@uscg.mil, lindsay.n.mongiovi@uscg.mil
(Donna.J.O'Neal@uscg.mil, lindsay.n.mongiovi@uscg.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Statement of Work (SOW) Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG�s aboard CGC GASCONADE Background The purpose of this project is to replace both existing controllers on the cutters SSDG�s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment. Contractor Furnished Equipment Qty 2 � CAT Kit ELEK GP � 10R-6991 3. Scope of Work The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks: Removal of Old Controller: Safely disconnect and remove the existing controllers from the equipment. Ensure no damage is caused to surrounding components during removal. Installation of New Controller: Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications. Verify that all connections are secure and properly aligned. Calibration of Controller: Calibrate the newly installed controllers per the manufacturer's instructions. Ensure the controllers are functioning optimally and meets operational requirements. 4. Deliverables The contractor shall provide the following: Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers. Documentation of calibration settings and procedures performed. A brief report confirming the successful completion of the work and equipment functionality. 5. Period of Performance The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager. 6. Location of Work The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118 7. Contractor Responsibilities The contractor shall: Comply with all safety regulations and standards during the execution of work. Provide qualified personnel to perform the tasks outlined in this SOW. Ensure all tools and equipment used are in good working condition. 8. Government Furnished Equipment (GFE) None 9. Acceptance Criteria The work will be considered complete when: The old controllers have been removed without damage to the equipment. The new controllers have been installed and calibrated per the manufacturer's instructions. The equipment is fully operational and meets performance standards. 10. Points of Contact Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/d108f1bfd85e4538991fa9ae9204626e/view)
 
Place of Performance
Address: Saint Louis, MO 63118, USA
Zip Code: 63118
Country: USA
 
Record
SN07673600-F 20251225/251223230032 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.