| 
 
|  |  |  | 
 | Y - Construction of Structures and Facilities SOLICITATIONS 
 
 CONSTRUCTION OF USCG MID-ATLANTIC AIR STATION
 NEW CONSTRUCTION OWNED POSTAL FACILITY IN PHOENIX,
 LANCASTER, PENNSYLVANIA - PROCESSING & DISTRIBUTION
 ADVANCED SYSTEM INTEGRATION LABORATORY (PHASE 1),
 REQUIREMENTS CONTRACT: CONSTRUCT PRE-ENGINEERED STEEL
 FLAMING GORGE WALKWAY ELEVATOR AND BRIDGE, FLAMING
 MAIN SECURITY GATE HOUSE AT THE MARINE CORPS AIR
 ADD/ALTER COMMISSARY, FORT GILLEM GA
 CONSOLIDATE P.O.L. YARD SOTO CANO AIR BASE, HONDURAS
 THOMAS CANYON CAMPGROUND BRIDGES PILE DRIVING PROJECT
 WEIGHT ROOM ADDITION
 ADD/ALTER COMMISSARY ON FORT CARSON CO
 INSTALL TRANSFER SWITCHES
 SHOWER ROOM RENOVATION
 CONSTRUCT SANDBLAST WATER LINE
 CONSTRUCT SANDBLAST WATER LINE
 GOLCONDA ACTIVITY BUILDING
 CONSTRUCT PARKING LOT, NMRC, HARLINGEN, TX
 ENCLOSE CORRIDOR
 REPAIR/CONSTRUCTION OF LOW WATER CROSSINGS AT STONEY
 KENNEL CREEK BRIDGE REPLACEMENT
 KNF FOG SEAL & STRIPING. THIS TRANSMITTAL IS CANCELLED
 IN SHOKAN, ULSTER, NY 12481
 CONSTRUCTION OF NEW BOAT RAMP - LOA RANGER DISTRICT,
 KNF FOG SEAL & STRIPING
 FLINT CREEK BRIDGE
 JEFFCO TAXIWAY PAVING
 PLAYGROUND EQUIPMENT AND SECURITY VIDEO SYSTEM FOR
 CONSTRUCTION OF SOURGRASS RECREATION AREA (CAMPGROUND)
 CONCRETE BOX CULVERT
 CONSTRUCTION OF APROX. 4,000 FT. OF PAVED TRAIL 6' AND
 Today's CBD Index Page
 Created on September 22, 1996 by Loren Data Corp. -- 
info@ld.com
 | 
 |  |