| 
 
|  |  |  | 
 | Z - Maintenance, Repair or Alteration of Real Property SOLICITATIONS 
 
 INSTALL METAL FLASHINGS.
 CROSS CONNECTION CONTROL AND BACK FLOW PREVENTION PHASE
 REPLACE/REPAIR STEAM HEATING SYSTEM IN BOILER PLANT
 MAINTENANCE, REPAIR, AND ALTERATION OF REAL PROPERTY
 CHILLER PLANT DEMOLITION
 CORRECT HVAC DEFICIENCIES (ADMINISTRATIVE BUILDING) --
 RENOVATIONS TO QUARTERS #3
 RENOVATE RADAR APPROACH CONTROL (RAPCON), BUILDING
 VEHICLE PARKING ENCLOSURE -- ALBANY, NY PROCESSING &
 ROOF REPLACEMENT
 REPLACE MECHANICAL UTILITIES FROM MANHOLE #3 TO
 REPLACE RAILROAD TRACKAGE AT CREIGTON STREET,
 INSTALL VENTILATION AND UTILITIES FOR RUBBER LAB
 RENOVATE BUILDINGS 170 AND 174 FOR TELEPHONE ROOMS,
 FY97 HOUSING PROJECT R-110, ENTRANCE IMPROVEMENTS FOR
 MODIFY ELEVATOR S-2 FOR REFURBISH AMBULATORY CARE,
 DRAINAGE MAINTENANCE
 PROVIDE AND INSTALL NEW SEWER PIPELINE AT THE SEATUCK
 EARTHWORK TO REGRADE AND LINE EXISTING POND. CONCRETE
 SOUTHEAST RETAIL STORE, SPRINGFIELD, MO, 95801-9998
 LEASE OF ONE CUTTERHEAD HYDRAULIC PIPELINE DREDGE,
 REROOFING AND REPAIR OF ROOFS AT FORT LEWIS,
 FURNISH AND INSTALL SHOWER VALVE BOXES IN BLDG 5422 AT
 FURNISH AND INSTALL SHOWER VALVE BAX ASSEMBLIES IN
 REROOF B. 513 AT THE PUGET SOUND NAVAL SHIPYARD,
 REPLACE HEATING AND A/C SYSTEM, BLDGS. 3 & 6, NAVAL
 STRIP, PRIME AND REPAINT FOUR STORAGE TANKS, NAVAL AIR
 INSTALL GAS LINES TO MAYNARD AND HOUSING AND CONVERT
 Today's CBD Index Page
 Created on February 10, 1997 by Loren Data Corp. -- 
info@ld.com
 | 
 |  |