| 
 
|  |  |  | 
 | Z - Maintenance, Repair or Alteration of Real Property SOLICITATIONS 
 
 EAST SHORE ROAD MAINTENANCE II
 INSTALL AUDIO/VISUAL SYSTEMS
 MAINTENANCE DREDGING, NAVAL STATION, NORFOLK, VIRGINIA
 CARPET REPLACEMENT/INSTALLATION, EGLIN AFB FL
 PAVING OF MIFFLIN AVENUE AT DEFENSE DISTRIBUTION DEPOT
 RENOVATE 1-2A
 FIRE SPRINKLERS, BUILDING 47
 PREVENTATIVE MAINTENANCE AND REPLACE CIRCUIT SWITCHERS
 MODIFICATION AND UPGRADE OF EXISTING NOTIFIER FIRE
 REPAIR ALPHA/BRAVO TAXIWAY AT THE FALLON NAVAL AIR
 JOC, CONSTRUCTION, ALTERATION, AND REPAIR AT MCAS
 Z -- REPAIR PAVEMENTS -- BASEWIDE
 REPAIR FLOORS/DOORS/CABINETS-CARDINAL HEIGHTS (PHASE
 RENOVATE BUILDING 1112CP AT NAVAL STATION NEWPORT, RI
 REMEDIAL WORK TO UPGRADE HVAC SYSTEMS IN THE DORMITORY
 GRIND/SEAL CRACKS, OVERLAY MAKO RAMP
 SERVICE AND MATERIAL FOR CARPENTERS PER STATEMENT OF
 ERIE, PENNSYLVANIA; RAIL REPAIR AT U.S. COAST GUARD
 FIRE SPINKLERS, BUILDING 47
 PROVIDE AND INSTALL POOL SOLARIUM
 OFFICE ADDITION AND GREENHOUSES
 STRUCTURAL REPAIRS, PHASE IV BUILDINGS
 RENOVATE ROADWAY AT LONG ISLAND NATIONAL CEMENTERY
 SPRINKLER SYSTEM AND ROOF REPLACEMENT, DANBURY CT
 SUBMERSIBLE DIKE REPAIR PROJECT, LOCK AND DAM NO. 18,
 FACILITIES MAINTENANCE AND REPAIR SERVICES, SUBASE,
 REPAIR ALERT SHELTER PAVEMENT, FANG
 REPAIR HVAC SYSTEMS, BLDG 826, SHAW AFB, SC
 ROOF REPLACEMENT ON WAREHOUSES NO. 58 AND 56
 CHATTANOOGA, TN-REPAVE DRIVEWAY @USCG SHORESIDE
 REPLACE CONCRETE JOINT SEALS, FANG
 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS REGIONAL
 JACKSON, MS -- M.W. EVERS POST OFFICE -- REROOF
 REPAIR WINDOWS AND SIDING BUILDING 1801, CP- KAY HALL
 PAINTING OF ANIMAL HOLDING FACILITIES
 DIATHON ELASTOMERIC ROOF COATING
 DESIGN/BUILD REVOLVING AUTOMATIC DOOR, BLDG. #8
 INSTALL TOILET ROOM / REPAIR EXTERIOR WALLS, BLDG.
 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS REGIONAL
 ELEVATOR MODERNIZATION, B. MCMAHON FED. BLDG.,
 UPGRADE OF EXISTING HVAC CONTROLS, NAVAL AND MARINE
 REPAIR OF CONDUCTIVE FLOOR AMMEDMENT
 REPAIR DAMAGED CONCRETE RAMP
 RENOVATE ROADWAY AT LONG ISLAND NATIONAL CEMENTERY
 REVITALIZATION OF COMMUNICATION DUCTBANK, PHASE 1
 REPAIR DAMAGED CONCRETE RAMP
 PREVENTIVE MAINTENANCE
 SOURCES SOUGHT FOR REPAIR AND/OR REPLACEMENT OF
 This Issue's Index
 Today's CBD Index Page
 Created on June 22, 2000 by Loren Data Corp. -- 
info@ld.com
 | 
 |  |